Lefroy Brooks M1-2200 Installation Instructions Manual page 6

Cross handle 5-hole bath set & pull-out black hand shower with deck diverter trim only, to suit r1-4006 rough. lever 5-hole bath set & pull-out black hand shower with cross handle deck diverter - trim only, to suit r1-4007 rough. lever 5-hole bath set &
Table of Contents

Advertisement

Steps 5
Installation Procedure
Lefroy Brooks always recommends that plumbing products be installed by a licensed professional.
Shut off main water supply before installation.
5
Attach hand shower with final trim
installation.
6
6
After installing faucet, remove aerator and
open the hot and cold supplies. Check for
leaks. Turn on faucet handle for one minute
to flush debris from faucet. Turn off the
water supply, install the canopy and
handle, then reassemble the aerator.
5
6

Advertisement

Table of Contents
loading

This manual is also suitable for:

M1-2207M1-2202M1-2204M1-2209M1-2206

Table of Contents