Download Print this page

Dapper Lighting 575 Install Manual page 2

Headlamps

Advertisement

6
Now locate your Dapper
Lighting H11-9006 adapter.
Take the 9006 end of your
9006-H11 adapter with the
blue connector and plug it
into the HID ballast. Make
sure you use the small
TRIANGULAR tab on the HID
ballast to clip onto (if you clip
onto the larger square tab, you will have reversed polarity and the lights won't turn on.) Then, take other
end of the H11-9006 adapter (H11 end) and plug it into the H11 end of your Dapper Lighting H4-H11
adapter.
7
Take the black end of your H4-H11 adapter with the 3-pronged
plug and MAKE SURE the gold pins in our adapter match up to
the individual slots on your OEM plug. In other words, make sure
the RED (power) pin is connected to your low beam ("drive") slot,
and your BLACK (ground) pin is connected to your ground slot.
Once you're sure the adapter pins and your OEM plug are lined up
properly, plug it in and turn on your headlamps.
8
If your low and high beam headlights both turn on as they should then your install is complete. The
final step is to make sure you have the beams aligned optimally. You can find instructions on how to do
so on our website at www.dapperlighting.com.
9
If you find that your headlamps aren't turning on, or seem to be working on only high beam or only
low beam, double check the gold pins on the male end of our H4-H11 adapter, as you may have them in
the wrong spots. The pins can be removed using a small flathead screwdriver, and swapped in order to
match up with your vehicle's plug setup. Please feel free to give us a call regarding install ANY time and
we'll have a tech assist you.
10
Send us pictures! We love seeing how Dapper Lighting looks and performs on your ride! Email,
DM, tag us, etc. for a chance to be featured in our newsletter, on our social media pages, website, and
catalog! Thanks again from the team at Dapper.
For technical questions please contact us at:
info@dapperlighting.com
Phone: 415-493-8236
415-493-8236
dapperlighting.com

Advertisement

loading