Lenovo 9308-4PX Installation Manual page 10

42u enterprise primary/expansion rack
Table of Contents

Advertisement

• Once the rack cabinet is in the new location, do the following:
– Lower the four leveling pads.
– Install stabilizer brackets on the rack cabinet.
– If you removed any devices from the rack cabinet, repopulate the rack cabinet from the lowest
position to the highest position.
If a long distance relocation is required, restore the rack cabinet to the configuration of the rack
cabinet as you received it. Pack the rack cabinet in the original packaging material, or equivalent.
Also, lower the leveling pads to raise the casters off of the pallet and bolt the rack cabinet to the
pallet.
Statement 12
CAUTION:
See the instructions in the rack documentation before you install devices, remove devices, or relocate
the rack.
Statement 13
CAUTION:
The weight of this part or unit is more than 55 kg (121.2 lb). It takes specially trained persons, a lifting
device, or both to safely lift this part or unit.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9308-4ex

Table of Contents