Siemens 941 Installation Instructions Manual
Siemens 941 Installation Instructions Manual

Siemens 941 Installation Instructions Manual

Ce compliant fume hood controller application

Advertisement

CE Compliant Fume Hood Controller —
Application 941 and 942
Figure 1. CE Compliant Fume Hood
Controller(Standard enclosure).
Figure 2. CE Compliant Fume Hood Controller
(Otherenclosure).
Control Applications
941 and 942

Product Description

The Fume Hood Controller Board (Figure 1 and
Figure 2) is the main termination board for the Fume
Hood Controller. The board comes with a ferrite filter
to suppress electrical emissions from the 8-
conductor cable. The ferrite filter must be installed to
meet FCC requirements and CE compliance
Item No. 546-00085. Rev. CA
Installation Instructions
Product Numbers
546-00705
CE Compliant Fume Hood Controller
— Application 941 and 942 with cover
and mounting rail
546-00705E
CE Compliant Fume Hood Controller
— Application 941 and 942 with FHC
enclosure
NOTE:
Keep the controller board in its static
proof bag until you are ready to install.
Warning/Caution Notation
WARNING
Personal injury/loss of life may
occur if you do not follow the
procedures as specified.
CAUTION
Equipment damage or loss of data
may occur if you do not follow the
procedures as specified.
Expected Installation Times
23 minutes.
Required Tools and Materials
Smallflat-blade screwdriver
Prerequisites
Fume Hood Controller Enclosure is mounted
and wiring has been roughed-in.
Operator Display Panel is installed and
cable pulled to location of controller.
Document No. 546-00085
December 8, 2011
Page 1 of 7

Advertisement

Table of Contents
loading

Summary of Contents for Siemens 941

  • Page 1 CE Compliant Fume Hood Controller — Application 941 and 942 Product Numbers 546-00705 CE Compliant Fume Hood Controller — Application 941 and 942 with cover and mounting rail 546-00705E CE Compliant Fume Hood Controller — Application 941 and 942 with FHC...
  • Page 2 6. Connect the FLN trunk wiring as shown in is not FCC and CE compliant. Figure 4. 7. After all controllers are connected to the FLN reconnect the FLN trunk to the field panel. Page 2 of 7 Siemens Industry, Inc.
  • Page 3 The ferrite filter must be installed on the cable inside the enclosure to meet FCC and CE requirements (Figure 6). Figure 5. Installing a Ferrite Filter. Figure 6. Ferrite Filter Installed. The installation is complete. Siemens Industry, Inc. Page 3 of 7...
  • Page 4 Document No. 546-00085 Installation Instructions December 8, 2011 Figure 7. Fume Hood Controller with Damper Wiring (Application 941). Page 4 of 7 Siemens Industry, Inc.
  • Page 5 Document No. 546-00085 Installation Instructions December 8, 2011 Figure 8. Fume Hood Controller with Venturi Air Valve Wiring (Application 942). Siemens Industry, Inc. Page 5 of 7...
  • Page 6 White and Black. Figure 11. Four Horizontal Sash Configuration. Figure 9. Single Vertical Sash Configuration. Figure 12. Two Horizontal/One Vertical Sash Configuration. Figure 10. Two Horizontal Sash Configuration. Figure 13. Four Horizontal/One Vertical Sash Configuration. Page 6 of 7 Siemens Industry, Inc.
  • Page 7 Information in this document is based on specifications believed correct at the time of publication. The right is reserved to make changes as design improvements are introduced. APOGEE and Insight are registered trademarks of Siemens Industry, Inc. Other product or company names mentioned herein may be the trademarks of their respective owners.

This manual is also suitable for:

942546-00750a546-00750ae546-00750be

Table of Contents