Download Print this page

Checkout - Honeywell S05 Series Product Data

Spring return direct coupled actuators ms4105, ms4110, ms4120, ms71xx, ms7505, ms7510, ms7520, ms8105, ms8110, ms8120
Hide thumbs Also See for S05 Series:

Advertisement

CHECKOUT

Modulating/Floating Operation
1. Mount actuator for required application (either clock-
wise
or counterclockwise
the damper).
2. Connect power to terminals 1 and 2. (See Fig. 11 and
Table 6.)
3. Set "Mode Select" dial to desired control signal.
(See Fig. 4 and Table 5.)
4. Apply control signal for actuator 100% position.
(See Fig. 11 and Table 6.)
a. (0)2-10 Vdc: apply 10 Vdc signal to terminal 3.
b. 10-(0)2 Vdc: apply (0)2 Vdc signal to terminal 3.
c. (0)4-20 mA: apply 20 mA signal to terminal 3.
d. 20-(0)4mA: apply (0)4 mA signal to terminal 3.
e. Floating: apply 24 Vac to appropriate CW (3) or CCW
(4) terminal.
5. Actuator drives to 100% position.
6. Apply control signal for actuator 0% position.
(See Fig. 11 and Table 6.)
a. (0)2-10 Vdc: apply (0)2 Vdc signal to terminal 3.
b. 10-(0)2 Vdc: apply 10 Vdc signal to terminal 3.
c. (0)4-20 mA: apply (0)4 mA signal to terminal 3.
d. 20-(0)4mA: apply 20 mA signal to terminal 3.
e. Floating: apply 24 Vac to appropriate CW (3) or CCW
(4) terminal.
7. Actuator drives to 0% position.
Spring Return Operation
1. Mount actuator for required application (either clock-
wise
or counterclockwise
the damper).
2. Connect power to terminals 1 and 2. (See Fig. 11 and
Table 6.)
NOTE: For two-position models skip to step 5.
3. Set "Mode Select" dial to desired control signal.
(See Fig. 4 and Table 5.)
4. Apply control signal for actuator 50% position.
(See Fig. 11 and Table 6.)
a. Vdc Input Signal: apply 5-6 Vdc signal to terminal 3.
b. mA Input Signal: apply 10-12 mA signal to terminal 3.
63-2607—08
5. Allow the actuator to drive to 50% position.
6. Disconnect wire from terminal 1.
7. Actuator spring returns to 0% position.
8. Re-connect wire to terminal 1, actuator drives towards
rotation to open
Feedback Operation
1. Connect a multi-meter, set for Vdc, to terminals 2 and 5.
2. Apply the same signal as in step 4 of Modulating
3. The multi-meter reading increases to match the input
4. Apply the same signal as in step 6 of Modulating
5. The multi-meter reading decreases to match the input
Direct Checkout
1. Mount actuator for required application (either clock-
2. Check damper position and make sure that 24 Vac is
3. Apply control signal to the appropriate connections to
4. If actuator does not run, verify that the actuator is
5. If actuator is correctly installed and still does not run,
rotation to open
Two-Position Checkout
1. Mount actuator for required application (either clock-
2. Check damper position and make sure that power is
3. Actuator drives to 100% position.
4. Disconnect power from terminals 1 and 2.
5. Actuator spring-returns to 0% position.
6. If actuator is correctly installed and does not run, replace
14
c. Floating: apply 24 Vac to appropriate CW (3) or CCW
(4) terminal.
100% position.
Operation.
signal as actuator drives towards 100% position.
Operation.
signal as actuator drives towards 0% position.
wise
or counterclockwise
the damper).
present at the appropriate connections. (See Fig. 10.)
move the damper to the opposite position. The actuator
should drive the damper.
properly installed for either clockwise
clockwise
rotation.
replace the actuator.
wise
or counterclockwise
the damper).
present at terminals 1 and 2.
the actuator.
rotation to open
or counter-
rotation to open

Hide quick links:

Advertisement

loading

This manual is also suitable for:

S20 seriesS10 series