Test Running - LG Standard inverter Installation Manual

Table of Contents

Advertisement

Test running

1. PRECAUTIONS IN TEST RUNNING
• The initial power supply must provide at least 90% of the rated voltage.
Otherwise, the air conditioner should not be operated.
① For test run, carry out the cooling operation firstly even during heat-
CAUTION
② Carry out the test run more than 5 minutes without fail.
• The test run is started by pressing the room temperature checking button and down timer but-
ton for 3 seconds at the same time.
• To cancel the test run, press any button.
CHECK THE FOLLOWING ITEMS WHEN INSTALLATION IS COMPLETE
• After completing work, be sure to measure and record trial run properties, and store measured
data, etc.
• Measuring items are room temperature, outside temperature, suction temperature, blow out tem-
perature, wind velocity, wind volume, voltage, current, presence of abnormal vibration and noise,
operating pressure, piping temperature, compressive pressure.
• As to the structure and appearance, check following items.
□Is the circulation of air adequate?
□Is the draining smooth?
□Is the heat insulation complete
(refrigerant and drain piping)?
□Is there any leakage of refrigerant?
2. Connection of power supply
1. Connect the power supply cord to the independent power supply.
• Circuit breaker is required.
2. Operate the unit for fifteen minutes or more.
3. Evaluation of the performance
1. Measure the temperature of the
intake and discharge air.
2. Ensure the difference between the
intake temperature and the discharge
one is more than 8°C (Cooling) or
reversely (Heating).
HAND OVER
Teach the customer the operation and maintenance procedures, using the operation manual.
(air filter cleaning, temperature control, etc.)
ing season. If heating operation is carried out firstly, it leads to the
trouble of compressor. Then attention must be paid.
(Test run will be cancelled 18 minutes later automatically)
□Is the remote controller switch operated?
□Is there any faulty wiring?
□Are not terminal screws loosened?
M4......118N . cm{12kgf . cm} M5......196N . cm{20kgf . cm}
M6......245N . cm{25kgf . cm} M8......588N . cm{60kgf . cm}
Thermometer
Test running
Installation Manual 19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents