CONTROL PANEL INSTALLATION
CONTROL PANELS
Control modules are supplied as standard with a 3m
multi-core cable for connection to the engine wiring loom.
Extension looms of 5m or more are available should your
installation require it or you wish to relocate your existing
panel/s, all looms include a start relay to overcome the
voltage drop.
For standard wiring diagrams see diagram index, page 88.
CONNECTING INTERCONNECTION CABLES
1. All electrical equipment must be protected from water.
To prevent corrosion and assist in connecting the cable
to the control panel to the engine we recommend
that the plug boots are packed with petroleum jelly
(Vaseline).
2. Carefully roll the 2 plastic protective boots back over
themselves and then push the 2 plug sockets together,
check all pins are fully engaged then use a cable tie
to lock them together (A). Pack the protective plastic
boots with petroleum jelly (Vaseline) then roll them
back to cover the plug sockets and overlap one over
the other. 2 cable ties should then be used to help
prevent help prevent any ingression of water (B & C),
please refer to the illustration below.
Plastic Boot
Pack with petroleum jelly (Vaseline)
44
Control Panel
or Module
Electrical Loom
IMPORTANT!
The control panel must be installed in a location
where the helmsman can either see or hear the
alarm system.
The location should also provide adequate
protection from adverse temperature, moisture
and vibration. If vulnerable a suitable
protective cover should be installed.
Ensure there is adequate clearance behind the
panel so connection block/s and wiring is not
at risk of being crushed.
3. All cables must be adequately clipped and protected
from abrasion.
4. Electrical systems shall be designed and installed so as
to ensure proper operation of the craft under normal
conditions of use and shall be such as to minimise risk
of fire and electric shock.
5. Attention shall be paid to the provision of overload
and short circuit protection of all circuits, except engine
starting circuits supplied from batteries.
Cable Tie (A)
Cable Tie (B)
Cable Tie (C)
45