PRODUCT DATA & INSTALLATION Bulletin B30-BHPA-PDI-50 1081587-50-1 CONTENTS Nomenclature... Features & Options... Capacity Data... Electrical Data... Wiring Diagram... Dimensional Data... Specifications... Installation Instructions... Service Parts List... Warranty... Project Information... “As Built” Service Parts List... High Profile ® Unit Cooler High & Medium Temperature Air Defrost Electrical Power:...
B = Bally High Profile Unit Cooler Nominal Capacity x 1000 (standard motor/fan blade) @ 10°F TD Application Range H = Hi / Medium Temp 7 FPI (0°F to 35°F Evap Temp) M = Medium Temp 6 FPI (0°F to 35°F Evap Temp) P = Medium Temp 4 FPI (0°F to 35°F Evap Temp)
High and Medium Temperature Models - Capacity @ 7 F.P.I. F ° ° 5 F ° ° 5 F ° ° 3 * Estimated, based on R404A at +25° S.S.T. with coil 30% full. Derate capacity by 0.92 and CFM by .85 for Throw Booster Option. Average Air Throw - ft (m) NOTE: 3+ indicates 3-fan “long”...
INSTALLATION INSTRUCTIONS The installation and start-up of Unit Coolers should only be performed by qualified refrigeration mechanics. This equipment should be installed in accordance with all applicable codes, ordinances and local by-laws INSPECTION Inspect all equipment before unpacking for visible signs of damage or loss.
Page 8
INSTALLATION INSTRUCTIONS PIPING Refrigerant line sizes are important and may not be the same size as the coil connections (depends on the length of run). If in doubt, consult “Recommended refrigerant line sizes” charts. WIRING Wire system in accordance with governing standards and local codes.
FINISHED GOODS WARRANTY The terms and conditions as described below in the General Warranty Policy cover all products manufactured by National Refrigeration. Subject to the terms and conditions hereof, the Company warrants all Products, including Service Parts, manufactured by the Company to be free of defects in material or workmanship, under normal use and application for a period of one (1) year from the original date of installation, or eighteen (18) months from the date of shipment from the Company, whichever occurs first.
“AS BUILT” SERVICE PARTS LIST Service Parts List Service Parts List Service Parts List Service Parts List Service Parts List T T T T T o Be A o Be A o Be A o Be A ttached o Be A ®...