Download Print this page

Prier C-633 Installation, Operation & Maintenance Instructions

Mild climate commercial wall hydrant

Advertisement

Quick Links

Installation, Operation & Maintenance Instructions for the
PRIER C-633 Mild Climate Commercial Wall Hydrant
Thank you for purchasing the PRIER C-633 Mild Climate Commercial Wall Hydrant, the finest quality commercial
hydrant available. Your C-633 will provide you years of dependable service with little or no maintenance.
Please note: Your C-633 hydrant has drain holes under the packing nut. After shutoff, the drain holes will allow water to
drain for a few moments to prevent freezing. This is normal and according to design.
Installation:
Installation procedures may vary slightly depending on the seat option purchased and the
installation inlet options. The C-633 wall hydrant is available with the following inlet options:
C-633NCC (Straight)
1. No special installation tools are required. Determine the location for installation of the hydrant. Be sure there is
adequate piping to the wall for this shorter mild climate hydrant. This valve is designed for installation in either
horizontal or vertical position. If installing vertically, install with hose connection in "up" position.
2. Using the template provided on the box, bore a 1-3/8" diameter hole through the wall in the desired position, and a
¼" alignment hole that is ½" deep.
3. Insert the hydrant through the hole and secure it to the inside wall using the provided wall clamping ring. Seal
through wall penetration if required.
4. Flush all foreign particles from the water line before connecting the hydrant.
5. Connect the water supply piping to the hydrant as desired. With a closed-end hose on the valve creating back
pressure, test the installation for leakage.
6. If planning to solder the hydrant to the supply piping, open the hydrant to the full open position before soldering.
Excess heat to the valve will damage the sealing surfaces on the stem of the hydrant.
C-633NSV (360° Swivel)
1. No special installation tools are required. Determine the location for installation of the hydrant. Be sure there is
adequate piping to the wall for this shorter mild climate hydrant. This valve is designed for installation in either
horizontal or vertical position. If installing vertically, install with hose connection in "up" position.
2. Using the provided template, Bore two holes through the wall and remove the excess material between those to
create an opening for the swivel inlet of the valve.
3. Align your rotating inlet to the supply piping and secure the valve to the outside wall. Seal through wall penetration
if required.
4. Flush all foreign particles from the water line before connecting the hydrant.
5. Secure the hydrant to the supply piping and test for leakage.
Operation:
Operation of the C-633 Mild Climate Commercial Wall Hydrant is a simple process. Water flows through the hydrant after
turning the loose key one full turn counter-clockwise to the "on" position. The hydrant will achieve maximum flow at 2
1/2 full turns. Turn off the hydrant by turning the loose key clockwise to the "off" position. The hydrant will drain for a few
moments. If the dripping persists after a few moments, tighten the key slightly until the dripping stops. Be careful not to
overtighten the hydrant. The C-633 incorporates an integral atmospheric anti-siphon vacuum breaker that, in the rare
occurrence of a back siphonage, opens to the atmosphere preventing contamination of the water supply. As well as an
atmospheric vacuum breaker, the C-633 incorporates vacuum breaker check valve in the rare case that water is forced
backwards into the valve.
*ALWAYS REMOVE HOSE DURING FREEZING TEMPERATURES*
*INTENDED FOR IRRIGATION USE AND OUTDOOR WATERING*
Maintenance:
The C-633 Mild Climate Commercial Wall Hydrant leaves the factory fully air tested and operational. It is treated with an
FDA approved lubrication. The hydrant requires no scheduled maintenance to provide long life. If the stem is removed, the
bypass O-Ring needs to be replaced and lubricated with an FDA approved lubricant to avoid tearing.
*Please leave this sheet for the property owner*
I
NSTALLATION
1. Determine the location for installation of the Freeze-
less Hydrant. Be sure there is adequate work area on
I
NSTALLATION
the interior of the structure for securing the Freezeless
P
I
Hydrant to the waterline.
RIER
NSTALLATION
I
:
NSTALLATION
2. The Prier C-634 is designed for installation in either
1. Determine the location for installation of the Freeze-
1. Determine the location for installation of the Freeze-
horizontal or vertical position. If using vertical installa-
less Hydrant. Be sure there is adequate work area on
less Hydrant. Be sure there is adequate work area on
tion, it is recommended that the hydrant be installed with
the interior of the structure for securing the Freezeless
the interior of the structure for securing the Freezeless
the hose threads in the "up" position. Refer to drawings
Hydrant to the waterline.
Hydrant to the waterline.
to the right for correct installations.
2. The Prier C-634 is designed for installation in either
2. The Prier C-634 is designed for installation in either
3. Using the template provided on the box, bore a 1
horizontal or vertical position. If using vertical installa-
N
1" MIP x 3/4" FIP
horizontal or vertical position. If using vertical installa-
diameter hole through the wall in the desired position,
tion, it is recommended that the hydrant be installed with
tion, it is recommended that the hydrant be installed with
P
1" Male SWT x 3/4" Female SWT
and a
1
the hose threads in the "up" position. Refer to drawings
the hose threads in the "up" position. Refer to drawings
V
3/4" ProPress Ready
to the right for correct installations.
to the right for correct installations.
4. If planning to solder the Freezeless Hydrant to the
*P and V inlets only available with CC length
supply piping, remove the operating stem before apply-
3. Using the template provided on the box, bore a 1
3. Using the template provided on the box, bore a 1
ing heat to the valve. Heating the valve will damage the
diameter hole through the wall in the desired position,
diameter hole through the wall in the desired position,
sealing surfaces on the stem of the Freezeless Hydrant
and a
/
" hole that is
1
and a
/
" hole that is
/
" deep.
1
1
4
4
2
5. Flush all foreign particles from the water line before
4. If planning to solder the Freezeless Hydrant to the
4. If planning to solder the Freezeless Hydrant to the
connecting the Freezeless Hydrant. Foreign particles
supply piping, remove the operating stem before apply-
supply piping, remove the operating stem before apply-
may clog the vacuum breaker/backflow preventor caus-
ing heat to the valve. Heating the valve will damage the
ing heat to the valve. Heating the valve will damage the
ing it to fail.
sealing surfaces on the stem of the Freezeless Hydrant
sealing surfaces on the stem of the Freezeless Hydrant
6. Insert the Freezeless Hydrant through the previously
5. Flush all foreign particles from the water line before
5. Flush all foreign particles from the water line before
bored hole and secure the hydrant to the inside of the
connecting the Freezeless Hydrant. Foreign particles
connecting the Freezeless Hydrant. Foreign particles
wall with the provided wall clamping ring.
may clog the vacuum breaker/backflow preventor caus-
may clog the vacuum breaker/backflow preventor caus-
7. Secure the Freezeless Hydrant to the supply piping.
ing it to fail.
ing it to fail.
Test the installation for leakage.
6. Insert the Freezeless Hydrant through the previously
6. Insert the Freezeless Hydrant through the previously
bored hole and secure the hydrant to the inside of the
P
bored hole and secure the hydrant to the inside of the
ARTS
wall with the provided wall clamping ring.
wall with the provided wall clamping ring.
7. Secure the Freezeless Hydrant to the supply piping.
7. Secure the Freezeless Hydrant to the supply piping.
Test the installation for leakage.
Test the installation for leakage.
P
:
ARTS
P
:
ARTS
12
7
I
, O
NSTALLATION
PERATION
P
C-634 H
RIER
EAVY
:
I
, O
NSTALLATION
PERATION
, O
& M
PERATION
AINTENANCE
P
C-634 H
C-634 H
RIER
C
EAVY
:
EAVY
OMMERCIAL
I
NSTALLATION
P
RIER
I
:
NSTALLATION
/
" hole that is
/
" deep.
1
4
2
1. Determine the location for installation of the Freeze-
less Hydrant. Be sure there is adequate work area on
the interior of the structure for securing the Freezeless
/
"
3
Not Recommended
8
Hydrant to the waterline.
/
" deep.
1
O
2
PERATION
2. The Prier C-634 is designed for installation in either
horizontal or vertical position. If using vertical installa-
The operation of a Prier C-634 Freezeless Wall
tion, it is recommended that the hydrant be installed with
Hydrant is simple. The Freezeless Hydrant will
the hose threads in the "up" position. Refer to drawings
begin to flow at about 1 full turn of the key and will
to the right for correct installations.
achieve maximum flow at 2
3. Using the template provided on the box, bore a 1
After shutoff, the hydrant will drain water from be-
diameter hole through the wall in the desired position,
hind the packing nut. If the water drains for more
and a
/
" hole that is
/
" deep.
1
than 1 minute, the stopper may need to be replaced.
1
4
2
Do not overturn when opening or closing the hydrant!
4. If planning to solder the Freezeless Hydrant to the
M
supply piping, remove the operating stem before apply-
AINTENANCE
:
ing heat to the valve. Heating the valve will damage the
The Prier C-634 Freezeless Wall Hydrant requires no
sealing surfaces on the stem of the Freezeless Hydrant
scheduled maintenance for long wear life. If the op-
12
erating stem is removed, replacement of the O-Ring
5. Flush all foreign particles from the water line before
on the worm sleeve and worm drive is recommended.
connecting the Freezeless Hydrant. Foreign particles
may clog the vacuum breaker/backflow preventor caus-
6
5
ing it to fail.
6. Insert the Freezeless Hydrant through the previously
12
bored hole and secure the hydrant to the inside of the
7
13
wall with the provided wall clamping ring.
9
7. Secure the Freezeless Hydrant to the supply piping.
1
Test the installation for leakage.
11
P
:
ARTS
7
13
3
13
3
4
8
12
11
11
10
7
PRIER Products, Inc.
4515 E 139th St.
Grandview, MO 64030
800-362-9055 Fax: 800-362-1463
www.PRIER.com
4515 East 139th Street
Grandview, MO 64030
(800) 362-9055
Fax (800) 362-1463
& M
I
AINTENANCE
NSTRUCTIONS FOR
4515 East 139th Street
4515 East 139th Street
C
W
H
Grandview, MO 64030
OMMERCIAL
ALL
YDRANTS
Grandview, MO 64030
(800) 362-9055
(800) 362-9055
Fax (800) 362-1463
Fax (800) 362-1463
& M
I
AINTENANCE
NSTRUCTIONS FOR
I
NSTRUCTIONS FOR
C
W
H
Recommended
W
OMMERCIAL
H
ALL
YDRANTS
ALL
YDRANTS
Recommended
Recommended
, O
& M
PERATION
AINTENANCE
/
"
3
Not Recommended
8
C-634 H
C
Acceptable
EAVY
OMMERCIAL
O
:
PERATION
The operation of a Prier C-634 Freezeless Wall
Hydrant is simple. The Freezeless Hydrant will
/
"
3
begin to flow at about 1 full turn of the key and will
Not Recommended
8
Acceptable
achieve maximum flow at 2
O
:
PERATION
:
After shutoff, the hydrant will drain water from be-
The operation of a Prier C-634 Freezeless Wall
hind the packing nut. If the water drains for more
Hydrant is simple. The Freezeless Hydrant will
than 1 minute, the stopper may need to be replaced.
begin to flow at about 1 full turn of the key and will
achieve maximum flow at 2
Do not overturn when opening or closing the hydrant!
/
full turns.
1
2
M
:
After shutoff, the hydrant will drain water from be-
AINTENANCE
/
"
3
hind the packing nut. If the water drains for more
The Prier C-634 Freezeless Wall Hydrant requires no
8
than 1 minute, the stopper may need to be replaced.
scheduled maintenance for long wear life. If the op-
O
PERATION
erating stem is removed, replacement of the O-Ring
Do not overturn when opening or closing the hydrant!
The operation of a Prier C-634 Free
on the worm sleeve and worm drive is recommended.
M
:
Hydrant is simple. The Freezeless
:
AINTENANCE
ID
begin to flow at about 1 full turn of the
The Prier C-634 Freezeless Wall Hydrant requires no
5
6
1
achieve maximum flow at 2
scheduled maintenance for long wear life. If the op-
2
3
erating stem is removed, replacement of the O-Ring
4
After shutoff, the hydrant will drain w
5
on the worm sleeve and worm drive is recommended.
hind the packing nut. If the water dra
6
9
7
than 1 minute, the stopper may need to
2
ID
Part No.
8
5
ID
6
Part No.
Description
1
300-6003
1
9
1
300-6003
Valve Stem Cap-Brass
Do not overturn when opening or closin
2
300-6004
10
2
300-6004
Hose Piece-Brass
3
336-0001
11
3
M
336-0001
O-Ring for Worm Sleeve Buna
4
336-6001
AINTENANCE
12
4
336-6001
O-Ring for Worm Drive Buna
5
337-6001
13
5
337-6001
Stop Check-Acetal
The Prier C-634 Freezeless Wall Hydra
6
346-6001
6
346-6001
VB Check Washer-Silicone
3
9
7
399-6001
4
8
scheduled maintenance for long wear
7
399-6001
2
Stopper-Brass & EPDM
8
C-108KT-808 Operating Key on Lanyard
2
8
C-108KT-808 Operating Key on Lanyard
1
erating stem is removed, replacement
9
C-634KT-806 Vacuum Breaker Check Valve Assy
9
C-634KT-806 Vacuum Breaker Check Valve Assy
10
C-634KT-809 Worm Drive Assembly-Brass
on the worm sleeve and worm drive is re
10
C-634KT-809 Worm Drive Assembly-Brass
11
C-634KT-808 Worm Sleeve Assembly-Brass
11
C-634KT-808 Worm Sleeve Assembly-Brass
10
12
C-634WCR
12
C-634WCR
Wall Clamp Ring-Iron
13
231-06CC
13
231-06CC
Stem for Close Coupled C-634
5
6
231-0604
231-0604
Stem for 4" C-634
4
8
231-0606
231-0606
Stem for 6" C-634
231-0608
231-0608
Stem for 8" C-634
231-0610
231-0610
Stem for 10" C-634
231-0612
231-0612
Stem for 12" C-634
231-0614
10
231-0614
Stem for 14" C-634
231-0618
9
231-0618
Stem for 18" C-634
231-0624
231-0624
Stem for 24" C-634
13
3
4
10
11
4515 East 139th Str
Acceptable
Grandview, MO 64
(800) 362-9055
Fax (800) 362-1463
I
NSTRUCTIONS FOR
Acceptable
Acceptable
W
H
ALL
YDRANTS
Acceptable
Recommended
/
full turns.
1
2
Accepta
/
full turns.
1
2
Accepta
Not Recommended
:
Part No.
Description
300-6003
Valve Stem Cap-Brass
/
full turn
1
300-6004
Hose Piece-Brass
2
336-0001
O-Ring for Worm Sleeve Buna
336-6001
O-Ring for Worm Drive Buna
337-6001
Stop Check-Acetal
346-6001
VB Check Washer-Silicone
399-6001
Stopper-Brass & EPDM
Description
C-108KT-808 Operating Key on Lanyard
Valve Stem Cap-Brass
C-634KT-806 Vacuum Breaker Check Valve Assy
Hose Piece-Brass
C-634KT-809 Worm Drive Assembly-Brass
O-Ring for Worm Sleeve Buna
C-634KT-808 Worm Sleeve Assembly-Brass
:
O-Ring for Worm Drive Buna
C-634WCR
Wall Clamp Ring-Iron
Stop Check-Acetal
231-06CC
Stem for Close Coupled C-634
VB Check Washer-Silicone
231-0604
Stem for 4" C-634
Stopper-Brass & EPDM
231-0606
Stem for 6" C-634
231-0608
Stem for 8" C-634
231-0610
Stem for 10" C-634
231-0612
Stem for 12" C-634
231-0614
Stem for 14" C-634
Wall Clamp Ring-Iron
231-0618
Stem for 18" C-634
Stem for Close Coupled C-634
ID
Part No.
231-0624
Stem for 24" C-634
Stem for 4" C-634
1
300-6003
Valve Stem
Stem for 6" C-634
2
300-6004
Hose Piece
Stem for 8" C-634
3
336-0001
O-Ring for W
Stem for 10" C-634
4
336-6001
O-Ring for W
Stem for 12" C-634
5
337-6001
Stop Check
Stem for 14" C-634
6
346-6001
VB Check W
Stem for 18" C-634
7
399-6001
Stopper-Bra
2
Stem for 24" C-634
8
C-108KT-808 Operating K
1
9
C-634KT-806 Vacuum Bre
10
C-634KT-809 Worm Drive
11
C-634KT-808 Worm Slee
12
C-634WCR
Wall Clamp
13
231-06CC
Stem for Clo
231-0604
Stem for 4"
8
231-0606
Stem for 6"
231-0608
Stem for 8"
231-0610
Stem for 10
231-0612
Stem for 12
231-0614
Stem for 14
231-0618
Stem for 18
231-0624
Stem for 24

Advertisement

loading

Summary of Contents for Prier C-633

  • Page 1 NSTALLATION PERATION AINTENANCE NSTRUCTIONS FOR Please note: Your C-633 hydrant has drain holes under the packing nut. After shutoff, the drain holes will allow water to the interior of the structure for securing the Freezeless C-634 H Recommended C-634 H...
  • Page 2 2.625” 1.75” Furnish and install (choose C-633NSV Model or C-633NCC Model) commercial key operated wall hydrant manufactured by PRIER Products, Inc. Hydrant shall be surface mounted and shall have automatic draining capabilities with integral vacuum breaker/backflow preventer. Hydrant shall be capable of flowing a minimum of 15 gallons per minute at 25 PSI pressure change. Hydrant shaft shall be brass with threaded and sealed connections.