Page 2
Introduction Description Calibration Installation Operation Maintenance Troubleshooting Moore Industries’ STAR Center has a wide variety of quality instrumentation in stock and ready to ship. DELIVERY • Signal Transmitters • Temperature Transmitters • P/I and I/P Converters • Isolators and Converters •...
Page 3
Description The SIX serial number is located on a label affixed to the side panel of the unit. The SIX is loop-powered. When connected in a 12- 42 Vdc loop, it converts a standard process current Model Number.
Calibration Equipment Calibration Setup Table 2 lists the calibration equipment required for this Figure 1 shows the calibration setup for the SIX. To bench check procedure. This equipment is not check or calibrate the SIX, connect the unit as shown supplied with the unit.
Page 5
Table 2. SIX Calibration Equipment Equipment Characteristics Signal Source Appropriate for the intended SIX application, accurate to within ±0.05% of span, minimum DC milliammeter Fluke model 8899, or equivalent unit accurate to within ±0.05% of span, minimum. DC voltmeter with Voltmeter accurate to within ±0.05% of span, minimum.
Figure 1. SIX Calibration Setup Note that there are no internal adjustments or settings 3. Adjust zero potentiometer until milliammeter to effect on the SIX. Disassembly of any kind is not reads 4 mA for 4-20 mA units, 10 mA for recommended.
Pivoting on the clip, press down firmly until In this manual, the installation of the SIX is divided the SIX snaps into place. into two phases: physically mounting the unit, and making the electrical connections.
SIX terminal screws, and slip the appropriate stripped wire end into the terminal The SIX has four terminals on its front panel. They hole. Tighten the terminal screw. are labeled “+IN” and “–IN” for connection of the signal input, and “+PS”...
Figure 4. SIX Installed as a Repeater/Diverter Operation Troubleshooting Once mounted and connected according to the If the SIX is found to be performing below specifica- instructions, the SIX operates unattended. After the tion, complete the following checklist: initial calibration of the Zero and Span potentio- 1.