ABB SafeGear Installation, Operation And Maintenance Manual page 23

Motor control center controller
Table of Contents

Advertisement

1.
11
Reinsert the blown fuse mechanism.
NOTE: Ensure the right position of the pins of the blown fuse
mechanism just as mentioned in point 2 and verify its right operation.
1.
Tighten the plastic bolts on the cover that supports the
12
blown fuse switch.
13
1.
The fuse replacement is complete.
SafeGear
Motor Control Center Controller Installation, Operation and Maintenance Manual 20
®

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents