Switch Ducting and Switch Support Bracket components of CDE3 require (4) rack spaces for installation. Switch Ducting and Switch Sup- port Bracket are to be installed at the same vertical rack position. CDE3 components are to be installed prior to switch installation and are designed to support the switch.