Download Print this page

Cleanload™ Details; Description Of Workstation; Tools; Lifting, Transport And Intermediate Storage - Pentair HYPRO Cleanload 3376-0870 Original Instruction

Chemical eductor

Advertisement

Cleanload™ Details
General Cleanload Details
Working Pressure
Flow Rates
Operating Temperature 34-115°F
Weight
Cleanload Model Details
Model
3376-0870
3376-0871
3376-1170
3376-1171
3376-1670
3376-1671
System Flow Rates:
3376-0870 & 3376-0871
3376-1170 & 3376-1171
Input
Eduction
Flow
Input
Pressure
Rate
Rate
Pressure
(PSI)
(gal/sec)
(gal/min)
(PSI)
40
0.63
19.34
20
60
0.75
23.43
40
80
0.96
26.65
60
100
1.39
29.46
80
100
3376-0870 & 3376-0871
3376-1170 & 3376-1171
Input
Eduction
Flow
Input
Pressure
Rate
Rate
Pressure
(bar)
(L/sec)
(L/min)
(bar)
2.7
2.38
73.21
1.4
4.1
2.84
88.70
2.7
5.5
3.63
100.89
4.1
6.9
5.26
111.51
5.5
6.9

Description of Workstation

The Cleanload is designed to be used by the operator, when installed in an approved location, during the loading and
draining of chemicals from the hopper, while the tank of the sprayer is being filled.
20-100 PSI
0.7-6.9 bar
(See flow data for specific pressure data.)
19-117 GPM
72-433 L/min
1-46°C
18 lbs.
8.2 Kg
Eductor Size
Flow Direction
8mm
Right
Left
11mm
Right
Left
16mm
Right
Left
3376-1670 & 3376-1671
Eduction
Flow
Input
Eduction
Rate
Rate
Pressure
Rate
(PSI)
(gal/sec)
(gal/sec)
(gal/min)
20
0.75
0.57
27.06
0.86
38.09
40
0.92
0.85
44.58
60
0.79
1.21
50.46
80
0.88
1.18
55.38
100
0.88
3376-1670 & 3376-1671
Eduction
Flow
Input
Eduction
Rate
Rate
Pressure
Rate
(L/sec)
(L/min)
(bar)
(L/sec)
2.16
102.43
1.4
2.86
3.24
144.19
2.7
3.49
3.22
168.77
4.1
2.98
4.60
191.00
5.5
3.35
4.46
209.62
6.9
3.35
- 4 -
The Cleanload can be easily mounted with minimal tools and hardware provided by the installer. Mount the Cleanload
using 3/8" or 10mm bolts.
The Cleanload is designed using Imperial (inch) size bolts, but it can be mounted by metric (mm) tools as well. In all
cases, an adjustable spanner wrench can be used to fit any size bolt.
The packaging consists of a cardboard box and fillers for easy shipping and handling.
During unpacking, inspect the contents of the packaging to ensure that all components are accounted for and
undamaged. If there are damaged or missing components, please contact the dealer or Hypro. Dispose of the
packaging materials properly according to local laws.
Shipment of the Cleanload may be done by a variety of transportation methods, including road, sea, air, or rail. Ensure
that the containers are securely fixed to the transport vehicle for safe shipment.
DO NOT stack more than three Cleanload packages high on a pallet and do not stack any additional
items on top of Cleanload packages.
If the Cleanload is to be stored for an extended period of time before installation, store the Cleanload in its packaging
in a cool dry area.
Flow
Rate
The Cleanload does not require assembly.
(gal/min)
64.29
80.88
94.63
Cleanload must be installed in accordance with Hypro installation instructions. Failure to follow
instructions completely will void the Limited Warranty.
106.19
The Cleanload is a versatile tool that can be used in a variety of applications. Because of the wide range of equipment
116.92
Cleanloads may be used with, it is not possible to list every installation detail. Consult the manufacturer's documen-
tation for the equipment on which you are mounting the Cleanload to identify suitable plumbing connections and
mounting locations.
Flow
Securely mount the Cleanload in a place that is out of the way of moving equipment, protected from crops and
Rate
terrain, and allows for safe routing of plumbing. Bolt in place using 3/8" or 10mm hardware. For mobile
(L/min)
installations, the Cleanload should be attached to substantial framework capable of supporting it over rough terrain.
243.36
The Cleanload should be mounted in a vertical position, ensuring that there is enough room for the hopper lid to be
306.15
fully opened. Ensure that the ball valve handles are easily accessible and have enough clearance to complete
their full range of motion.
358.21
Connect inlet and outlet hoses, minimum 2" (51mm) internal diameter, using appropriate fittings. Hoses should be
401.99
made of a compatible material(s) to work with the chemicals being used and a 200 psi (13.8 bar) pressure rating.
442.58
Route hoses so that there is no risk of persons tripping, falling or running into them. Hoses should also be routed
so that they are protected from abrasion and impact forces.
The arrow on the eductor fitting indicates the direction of flow. Both the inlet and outlet of the eductor are
compatible with 220 universal flanges.
For on-board sprayer installations, the hose from the outlet should be routed to the top of the spray tank to
prevent back-flow. Include anti-siphoning provisions, such as a one-way check valve, if a stand pipe is used
inside the tank to discharge chemical below the fluid level, or if top-routing is not possible.

Tools

Lifting, Transport and Intermediate Storage

Assembly and Installation

Assembly

Installation

- 5 -

Advertisement

loading

This manual is also suitable for:

Hypro cleanload 3376-0871Hypro cleanload 3376-1170Hypro cleanload 3376-1171Hypro cleanload 3376-1670Hypro cleanload 3376-1671