Step 5. Host System Unit Setup For Connection To The 8Mm Tape Library; Step 5A; Step 5B - IBM 7331 Installation Manual

8mm tape library
Table of Contents

Advertisement

Step 5. Host System Unit Setup for Connection to the 8mm Tape
Library
Is the System Unit Power On?
YES
NO

Step 5a.

Is the SCSI Card installed in the system unit ?
Note: A SCSI card is required for RS/6000 and PC Server attachment to the 8mm
YES
NO

Step 5b.

Is the SCSI Card installed in the system unit ?
Note: A SCSI card is required for RS/6000 and PC Server attachment to the 8mm
YES
NO
8
7331 and 3449 Installation Guide
Go to "Step 5a."
Go to "Step 5b."
Tape Library.
Go to "Step 7. Placing the 8mm Tape Library" on page 16.
Perform the following:
Note: The information required to do a controlled system
shutdown of the system unit can be found in the system
management or planning documentation, or obtained from
the person responsible for the management, planning,
configuration, or operation of the system.
1. Do a controlled system shutdown.
2. Install the SCSI card in the system unit. See the system unit
documentation for installation of the card.
3. Power on the system unit.
4. Go to "Step 7. Placing the 8mm Tape Library" on page 16.
Tape Library.
Perform the following:
1. Power on the system unit.
2. Go to "Step 7. Placing the 8mm Tape Library" on page 16.
Perform the following:
Note: The information required to do a controlled system
shutdown of the system unit can be found in the system
management or planning documentation, or obtained from
the person responsible for the management, planning,
configuration, or operation of the system.
Install the SCSI card in the system unit. See the system unit
documentation for installation of card.
Power on the system unit.
Go to "Step 7. Placing the 8mm Tape Library" on page 16.

Advertisement

Table of Contents
loading

This manual is also suitable for:

3449

Table of Contents