Download Print this page

MTD 800 series Operator's Manual page 11

Hide thumbs Also See for 800 series:

Advertisement

Overhead Chute Control (with Chute Control Rod)
1.
Remove wing nut (a) and hex
screw (b) from chute control assembly and
clevis pin (c) and cotter pin (d) from chute
support bracket. Position chute assembly
(forward-facing) over chute base. See
Figure 2-30.
Chute Control
Assembly
(b)
(c)
Chute
Support
Bracket
(d)
(a)
Chute
Chute
Base
Figure 2-30
2.
Place chute assembly onto chute base and
secure chute control assembly to chute
support bracket with clevis pin (c) and
cotter pin (d) removed in Step 1.
See Figure 2-31.
Figure 2-29
(c)
Figure 2-31
3.
Finish securing chute control assembly to
chute support bracket with wing
nut (a) and hex screw (b) removed in Step
1. See Figure 2-32.
(b)
Figure 2-32
4.
(d)
5.
6.
(a)
STOP
S
ection
Guide the chute crank rod through the
bracket located on the rear of the handle
panel . See Figure 2-33.
Figure 2-33
Remove the cotter pin (a) and insert the
chute crank rod (b) into the connector on
the chute control assembly.See Figure
2-34.
Align the hole in the chute crank rod with
the hole in the connector, secure with
cotter pin (a) previously removed.
(a)
(b)
Figure 2-34
STOP!
Continue to Adjustments -
(page 13).
2 — A
& S
-U
SSembly
et
p
11

Hide quick links:

Advertisement

loading

This manual is also suitable for:

500 series600 series