Download Print this page

Installation - Gared GP12G72DM Installation, Operation And Maintenance Instructions

All pro jam adjustable basketball system

Advertisement

INSTALLATION

Tools and Materials Required for Assembly:
1. (2) Adjustable Wrenches.
9
2. ¼", ½",
/
", ¾"
16
3. Phillips Head Screwdriver
4. Electric Drill
5. 11/64" Drill Bit
6. Tape Measure
7. Rubber Mallet
8. Shovel
9. Post Hole Digger.
10. Carpenter's Level
11. (2) Ladders – minimum
12. (2) Sawhorses
Materials Required for Assembly:
1. Concrete –1/2 yard or 14-16 bags of pre-mix (80 lb. bags)
All Pro Jam Adjustable Basketball System
11
15
1
/
", ¾",
/
, 1-
/
16
16
" Wrench
8
6

Advertisement

loading

This manual is also suitable for:

Gp12a72dmGp12p72dm