Table 3-2 Hardware installation check of the eA380
No.
1
2
3
When checking the cable connections of the eA380, check the items listed in Table 3-3 in
order.
Table 3-3 Cable connection check of the eA380
No.
1
2
Step 2 Perform the power-on check, as shown in Figure 3-17.
Issue 01 (2017-08-31)
Check Item
The installation position must strictly comply with the design
drawings, meet the installation space requirements, and reserve space
for maintenance.
When the eA380 is mounted on a metal utility pole, the fixture must
be firmly installed, and the LTE CPE must be attached.
When the eA380 is mounted on the wall, the installation hole on the
fixture must be aligned with the one on the expansion bolt. In addition,
the fixture must be tightly and firmly attached to the wall and must not
wobble when you shake it.
Check Item
No cable is short-circuited or inversely connected.
The connector of the PoE network cable must be appropriately
connected.
The waterproof connector of PoE must be tightened.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Installation
37

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ea380-135

Table of Contents