About This Manual; Inspecting Your Shipment - ADC HRM-238 List 2 User Manual

Higain retrofit management shelf
Table of Contents

Advertisement

November 18, 2005
To prevent electrical shock, be careful when working near HDSL loops and telecommunications
DANGER
circuits. Coming in contact with high electrical potential can result in death or severe personal
injury.
IMPORTANT
The shelf chassis must be properly grounded to ensure personal and equipment safety.
!
To prevent electrical shock, never install telco equipment in a wet location or during a lightning
DANGER
storm. When installing or modifying telco lines, disconnect lines on the network side before
working with uninsulated lines or terminals.
To prevent electrical shock, be careful when working near power supplies. Telco equipment uses
DANGER
-48 Vdc office power.
Electronic components can be damaged by electrostatic discharge (ESD). Before handling circuit
cards, wear an antistatic discharge wrist strap to prevent damage to electronic components.
Place components in static-shielding protective bags when transporting or storing. When
ATTENTION
working on components, always place them on an approved antistatic mat that is electrically
grounded.
I
Y
NSPECTING
OUR
Upon receipt of the equipment:
• Unpack each container and visually inspect the contents for signs of damage. If the equipment has been dam-
aged in transit, immediately report the extent of damage to the transportation company and to ADC. Order
replacement equipment, if necessary.
• Check the packing list to ensure complete and accurate shipment of each listed item. If the shipment is short
or irregular, contact ADC as described in
equipment for a prolonged period, store the equipment in its original container.
LTPH-UM-1315-01
S
HIPMENT
Appendix B: Product Support on page

About This Manual

B-1. If you must store the
xi

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hrm-238-l2

Table of Contents