RIDGID WD55000 Owner's Manual page 8

5 gallons/4.2 cdn. gallons stor n go wet/dry vac
Hide thumbs Also See for WD55000:
Table of Contents

Advertisement

Available languages

Available languages

SP6625 5 gallon RIDGID
Storage Rack Assembly & Mounting (cont.)
2. Locate wall stud and position the stor-
age rack so that all four screw holes are
over the stud. Level the rack and mark
the hole locations. Drill a 1/8 inch diam-
eter pilot hole at each location. Attach
the storage rack to wall studs using the
four screws provided. Make sure all four
screws are driven securely into the wall
stud.
3. If the desired location does not align
with a wall stud or the studs are
exposed, a 1/2 inch thick plywood panel
wide enough to span at least two studs,
must be attached to the studs with the
four screws provided. The storage rack
may then be attached to the plywood
panel with four 1 inch #10 pan or round
head wood screws (not provided).
NOTE:
Supplied
intended for mounting to typical wall
construction consisting of 5/8 inch drywall
or less.
CAUTION: To prevent plywood, Storage
Rack, or Wet/Dry Vac from falling, make
sure you have selected the proper length
of fastener for the secure mounting of stor-
age rack to the wall.
9/16/05
2:25 PM
wood
screws
are
Page 8
8
Storage Rack
Screw (4)

Advertisement

Chapters

Table of Contents
loading

Table of Contents