SA2-003 Installation Guide SwitchAir Active Network Switch Cooling Effective cool air delivery for front of rack mounted multi RU switches with single side air intake. Installation Precaution: • Install SwitchAir such that the required airflow for safe operation of equipment is not compromised.
Page 2
Install customer provided power cable to power distribution unit. Slide Chassis with Wiper into Channel and Fasten to Rack Front Using Cage Nuts and Screws. Plug Power Cord into Power Distribution Unit. Install Complete Cage Nuts and Screws GM1179 Geist Americas Geist Europe Geist Asia Geist DCIM China 800.432.3219...