Download Print this page
LG LSN-LSU-90-120HYV Installation Manual
Hide thumbs Also See for LSN-LSU-90-120HYV:

Advertisement

Quick Links

INSTALLATION MANUAL AIR CONDITIONER
LSN-LSU-90-120HYV
TYPE : WALL MOUNTED
TIPS FOR SAVING ENERGY
Here are some tips that will help you minimize the power consumption when you use the air
conditioner. You can use your air conditioner more efficiently by referring to the instructions
below:
• Do not cool excessively indoors. This may be harmful for your health and may consume more
electricity.
• Block sunlight with blinds or curtains while you are operating the air conditioner.
• Keep doors or windows closed tightly while you are operating the air conditioner.
• Adjust the direction of the air flow vertically or horizontally to circulate indoor air.
• Speed up the fan to cool or warm indoor air quickly, in a short period of time.
• Open windows regularly for ventilation as the indoor air quality may deteriorate if the air condi-
tioner is used for many hours.
• Clean the air filter once every 2 weeks. Dust and impurities collected in the air filter may block the
air flow or weaken the cooling / dehumidifying functions.
For your records
Staple your receipt to this page in case you need it to prove the date of purchase or for warranty
purposes. Write the model number and the serial number here:
Model number :
Serial number :
You can find them on a label on the side of each unit.
Dealer's name :
Date of purchase :
IMPORTANT SAFETY INSTRUCTIONS
READ ALL INSTRUCTIONS BEFORE USING THE APPLIANCE.
Always comply with the following precautions to avoid dangerous situations and ensure peak
performance of your product.
!
WARNING
It can result in serious injury or death when the directions are ignored.
!
CAUTION
It can result in minor injury or product damage when the directions are ignored.
!
WARNING
• Installation or repairs made by unqualified persons can result in hazards to you and others.
• Installation MUST conform with local building codes or, in the absence of local codes, with
the Nation Electrical Code NFPA 70/ANSI C1-1003 or current edition and Canadian Electrical
Code Part1 CSA C.22.1.
• The information contained in the manual is intended for use by a qualified service technician
familiar with safety procedures and equipped with the proper tools and test instruments.
• Failure to carefully read and follow all instructions in this manual can result in equipment mal-
function, property damage, personal injury and/or death.
Installation
• Don't use a power cord, a plug or a loose socket which is damaged.
- Otherwise, it may cause a fire or electrical shock.
• For electrical work, contact the dealer, seller, a qualified electrician, or an Authorized Service Center.
- Do not disassemble or repair the product. There is risk of fire or electric shock.
• Always ground the product.
- There is risk of fire or electric shock.
• Install the panel and the cover of control box securely.
- There is risk of fire or electric shock.
• Always install a dedicated circuit and breaker.
- Improper wiring or installation may cause fire or electric shock.
• Use the correctly rated breaker or fuse.
- There is risk of fire or electric shock.
• Do not modify or extend the power cable.
- There is risk of fire or electric shock.
• Do not let the air conditioner run for a long time when the humidity is very high and a door or a win-
dow is left open.
- Moisture may condense and wet or damage furniture.
• Be cautious when unpacking and installing the product.
- Sharp edges could cause injury. Be especially careful of the case edges and the fins on the con-
denser and evaporator.
• For installation, always contact the dealer or an Authorized Service Center.
- There is risk of fire, electric shock, explosion, or injury.
3
Pull back the tubing holder.
Bad case
4
Remove pipe port cover and positioning
- Following bending case from right to left di-
the tubing
rectly may cause damage to the tubing.
Indoor unit back side view
Tubing holder
Right
Left
Backwards
Downwards
* The feature can be changed according to a
type of model.
Good case
- Press on the tubing cover and unfold the
tubing to downward slowly. And then bend
to the left side slowly.
* The feature can be changed according to a
type of model.
!
CAUTION
Installation Information. For right piping.
Follow the instruction above.
- Before bending the tubing, set the conduit
like picture below by using the bracket and
black screws from accessory kit.
<Right side piping>
Installation of Indoor Unit
1
Hook the indoor unit onto the upper por-
tion of the installation plate.( engage the
three hooks at the top of the indoor unit
with the upper edge of the installation
plate) Ensure that the hooks are properly
seated on the installation plate by moving
View
it left and right.
Cover
Terminal block
Connecting cable
Cable retainer
Installation plate
3
Secure the cable onto the control board
with the cable retainer.
2
Unlock the tubing holder from the chassis
4
Close the cover of control box.
and mount between the chassis and instal-
lation plate in order to separate the bottom
5
Tape the tubing pipe, drain hose and the
side of the indoor unit from the wall.
conduit. Be sure that the drain hose is lo-
cated at the lowest side of the bundle.
Locating at the upper side can cause over-
flow from the drain pan through the inside
of the unit.
<Left side piping>
Tubing Holder
* The feature can be changed according to a
type of model.
Drain hose
Piping
Tape
1
Raise the cover of terminal block.
Conduit
2
Insert the connecting cable through the
Drain hose
bottom side of indoor unit and connect the
Connecting pipe
cable. (You can see detail contents in 'Con-
necting the cables' section.)
!
NOTE
<Left side piping>
Insert the drain hose at left side when
you use left side piping type.
<Right side piping>
View
Cover
Tape
Terminal block
Conduit
Connecting cable
Cable retainer
Drain hose
Connecting pipe
* The feature can be changed according to a
type of model.
P/No : MFL67502101
• Do not install the product on a defective installation stand.
- It may cause injury, accident, or damage to the product.
• Be sure the installation area does not deteriorate with age.
- If the base collapses, the air conditioner could fall with it, causing property damage, product failure,
and personal injury.
• There is a risk of fire and explosion.
- Inert gas (nitrogen) should be used when you check plumbing leaks, cleaning or repairs of pipes
etc. If you are using combustible gases including oxygen, product may have the risk of fires and ex-
plosions.
Operation
• Do not store or use flammable gas or combustibles near the product.
- There is risk of fire or failure of product.
!
CAUTION
Installation
• Always check for gas (refrigerant) leakage after installation or repair of product.
- Low refrigerant levels may cause failure of product.
• Install the drain hose to ensure that water is drained away properly.
- A bad connection may cause water leakage.
• Keep level even when installing the product.
- To avoid vibration or water leakage.
• Do not install the product where the noise or hot air from the outdoor unit could damage the neigh-
borhoods.
- It may cause a problem for your neighbors.
• Use two or more people to lift and transport the product.
- Avoid personal injury.
• Do not install the product where it will be exposed to sea wind (salt spray) directly.
- It may cause corrosion on the product. Corrosion, particularly on the condenser and evaporator
fins, could cause product malfunction or inefficient operation.
INSTALLATION PARTS
Name
Quantity
Shape
Installation plate
1 EA
The feature can be changed according to a type of model.
Type "A" screw
5 EA
Type "B" screw
2 EA
Type "C" screw
2 EA
Remote control
1 EA
holder
Screws for fixing panels are attached to decoration panel.
INSTALLATION TOOLS
Figure
Name
Figure
Screw driver
Electric drill
Measuring tape, Knife
Hole core drill
Spanner
Torque wrench
!
CAUTION
Must use the elbow type
(L-Type) conduit
Wrench
Method:
1. Disassemble bracket
Indoor unit tubing
(from indoor unit)
3. When needed to extend the drain hose of
2. Assemble it with conduit
indoor unit, assembly the drain pipe as
3. Reassemble it with
shown on the drawing
indoor unit..
!
CAUTION
Drain pipe
If the drain hose is routed inside the room
Indoor unit drain hose
insulate the hose with an insulation mate-
rial* so that dripping from sweating (con-
Vinyl tape(narrow)
Adhesive
densation) will not damage furniture or
floors.
* Foamed polyethylene or equivalent is
recommended.
Wrap the insulation material
around the connecting portion.
1
Overlap the connection pipe insulation ma-
terial and the indoor unit pipe insulation
material. Bind them together with vinyl
Connecting the installation pipe
tape so that there may be no gap.
and drain hose to the indoor unit.
1
Align the center of the pipes and suffi-
ciently tighten the flare nut by hand
Indoor unit tubing
Flare nut Pipes
2
Set the tubing cutting line upward.
2
Wrap the area which accommodates the
Tighten the flare nut with a wrench
rear piping housing section with vinyl tape.
Outside diameter
Torque
Cutting Line
mm
inch
kgf.m
Ø6.35
1/4
1.8~2.5
Ø9.52
3/8
3.4~4.2
Ø12.7
1/2
5.5~6.5
Ø15.88
5/8
6.3~8.2
Ø19.05
3/4
9.9~12.1
Gas Pipe
Liquid Pipe
Good Case
* Tubing cutting line have to be upward.
!
CAUTION
Indoor unit pipe
Connection pipe
Vinyl tape (wide)
Wrap with vinyl tape
• Before finishing installation of the indoor
unit, seal the hole of a wall except the
Connecting cable
pipe's ways to prevent condensate from
inflow of outdoor air.
Pipe
Vinyl tape(narrow)
3
Bundle the piping and drain hose together
Outdoor unit
by wrapping them with vinyl tape sufficient
enough to cover where they fit into the
Connecting the Piping
rear piping housing section.
- Remove the tubing cover from the unit by
Wrap with vinyl tape
loosening the screw.
Pipe
Vinyl tape(wide)
Drain hose
Finishing the indoor unit
installation
1
Mount the tubing holder in the original
positon.
2
Ensure that the hooks are properly seated
on the installation plate by moving it left
and right.
3
Press the lower left and right sides of the
unit against the installation plate until the
hooks engage into their slots (clicking
sound).
- Align the center of the pipings and suffi-
4
Finish the assembly by screwing the unit
ciently tighten the flare nut by hand.
to the installation plate by using two pieces
of type "C" screws. And assemble a chas-
sis cover.
Type 'C' screw
4
ENGLISH
INSTALLATION MAP
Saddle
* The feature can be changed according to a type of model.
!
NOTE
• You should purchase the installation parts.
INSTALLATION
Select the best Location
Indoor unit
- There should not be any heat or steam near
the unit.
- Select a place where there are no obstacles
around of the unit.
- Make sure that condensation drainage can
be conveniently routed away.
- Do not install near a doorway.
- Ensure that the interval between a wall and
the left (or right) of the unit is more than
100mm. The unit should be installed as high
as possible on the wall, allowing a minimum
of 200mm from ceiling.
- Use a metal detector to locate studs to pre-
vent unnecessary damage to the wall.
More than
100(3.9in)
More than 200(7.9in)
More than
Name
100(3.9in)
More than
Multi-meter
2400(94.4in)
(Unit : mm)
Hexagonal wrench
* The feature can be changed according to a
type of model.
Ammeter
!
CAUTION
Install the indoor unit on the wall where
the height from the floor is more than
Gas-leak detector
2300mm.
Thermometer,
Level
Flaring tool set
1
Open-end wrench
- Finally, tighten the flare nut with torque
(fixed)
wrench until the wrench clicks.
When tightening the flare nut with torque
Flare nut
wrench, ensure the direction for tightening
follows the arrow on the wrench.
Connection
pipe
Outdoor unit
Gas side piping
(Bigger diameter)
Liquid side piping
(Smaller diameter)
Torque wrench
Outside diameter
Torque
mm
inch
kgf.m
Ø6.35
1/4
1.8~2.5
Ø9.52
3/8
3.4~4.2
Ø12.7
1/2
5.5~6.5
Insulation material
Ø15.88
5/8
6.3~8.2
Ø19.05
3/4
9.9~12.1
Cutting Line
Bad Case
!
CAUTION
The power cord connected to the outdoor
unit should be complied with the
following specifications (UL recognized or
CSA certified).
AWG_"A"
Power supply cable
(mm
Capacity(Btu/h)
Power
9K/12k
Tubing cover
"A"
14
The power connecting cable connected to the
indoor and outdoor unit should be complied
with the following specifications (UL
recognized or CSA certified).
AWG_"B"
Connecting cable
(mm
Connecting
Capacity(Btu/h)
Cable
9k/24k
"B"
18
5
Indoor unit
Fixing Installation Plate
The wall you select should be strong and solid
enough to prevent vibration.
1
Before installation, confirm the position of
a screw between chassis and Installation
plate.
Installation plate
Sleeve
Bushing-Sleeve
Putty(Gum Type Sealant)
Bend the pipe as closely
on the wall as possible,
but be careful that it
doesn't break.
Vinyl tape (Wide)
• Apply after carrying out a
drainage test.
• To carry out the drainage
2
Mount the installation plate on the wall
test, remove the air filters
with type "A" screws. If mounting the unit
and pour water into the heat
on a concrete wall, use anchor bolts.
exchanger.
- Mount the installation plate horizontally
by aligning the centerline using Horizontal
meter .
Installation Plate
Gas side piping
(Optional Parts)
Liquid side piping
(Optional Parts)
Additional drain pipe
Vinyl tape (Narrow)
Drain Hose
Connecting cable
(Optional Parts)
Chassis
Hook
3
Measure the wall and mark the centerline.
It is also important to use caution concern-
ing the location of the installation plate.
Routing of the wiring to power outlets is
through the walls typically. Drilling the hole
through the wall for piping connections
must be done safely.
Burrs removal
1. Completely remove all burrs from the cut
cross section of pipe/tube.
Outdoor unit
2. While removing burrs put the end of the
copper tube/pipe in a downward direction
- If an awning is built over the unit to prevent
direct sunlight or rain exposure, make sure
while removing burrs location is also
that heat radiation from the condenser is not
changed in order to avoid dropping burrs
restricted.
into the tubing.
- Ensure that the space around the back and
sides is more than 300mm. The space in
front of the unit should be more than 700mm
of space.
- Do not place animals and plants in the path
of the warm air.
- Take the weight of the air conditioner into ac-
count and select a place where noise and vi-
bration are minimum.
- Select a place where the warm air and noise
Putting nut on
from the air conditioner do not disturb neigh-
bors.
- Remove flare nuts attached to indoor and
outdoor unit, then put them on pipe/tube
having completed burr removal.
(not possible to put them on after finishing
More than
flare work)
300
F e
n c e
Copper tube
o b
s t a
o r
More than
c l e
300
s
More than
600
More than
700
(Unit : mm)
Flaring work
1
Firmly hold copper pipe in a bar with the di-
mension shown in the table below .
2
Carry out flaring work with the flaring tool.
Outside diameter
mm
Ø6.35
Ø9.52
Ø12.7
Ø15.88
Ø19.05
2
Connecting the Cables
!
CAUTION
Connect the cable to the indoor unit by con-
necting the wires to the terminals on the con-
According to the confirmation of the
trol board individually according to the outdoor
above conditions, prepare the wiring as
unit connection. (Ensure that the color of the
follows.
wires of the outdoor unit and the terminal No.
1
Never fail to have an individual power
are the same as those of the indoor unit.)
circuit specifically for the air condi-
tioner. As for the method of wiring, be
guided by the circuit diagram posted
on the inside of control cover.
!
CAUTION
2
The screw which fasten the wiring in
the casing of electrical fittings are li-
- The circuit diagram is a subject to
able to come loose from vibrations to
change without notice.
which the unit is subjected during the
- The earth wire should be longer than the
course of transportation. Check them
common wires.
and make sure that they are all tightly
- When installing, refer to the circuit dia-
fastened. (If they are loose, it could
gram on the chassis cover.
cause burn-out of the wires.)
- Connect the wires firmly so that they
3
Specification of power source.
may not be pulled out easily.
4
Confirm that electrical capacity is suffi-
- Connect the wires according to color
cient.
codes, referring to the wiring diagram.
5
See that the starting voltage is main-
tained at more than 90 percent of the
rated voltage marked on the name
plate.
!
CAUTION
6
Confirm that the cable thickness is as
specified in the power source specifi-
- Assemble it with conduit.
cation.
(Particularly note the relation between
cable length and thickness.
7
Always install an earth leakage circuit
breaker in a wet or moist area.
8
The following would be caused by volt-
age drop.
- Vibration of a magnetic switch, which
will damage the contact point, fuse
breaking, disturbance of the normal
function of the overload.
9
The means for disconnection from a
power supply shall be incorporated in
the fixed wiring and have an air gap
contact separation of at least 3mm in
each active(phase) conductors.
- Connect the wires to the terminals on the
control board individually.
2
Do not make drain piping like the following.
- Secure the cable onto the control board with
the cord clamp.
- Use a recognized circuit breaker between
the power source and the unit.
A disconnecting device to adequately
disconnect all supply lines must be fitted.
Capacity(Btu/h)
Water
Circuit Breaker(A)
9K/12k
leakage
15
Outdoor unit
Terminal block
Water
leakage
2
Over 5mm
)
(0.2")
Conduit panel
Power supply
cord
Connecting
cable
Water
leakage
Cover control
*The feature can be changed according a type
of model.
!
CAUTION
Provide the circuit breaker between
* The feature can be changed according to a
power source and the unit as shown by
type of model.
Main power source
2
)
Air
Circuit Breaker
Conditioner
Use a circuit breake
or time delay fuse.
6
Place a level on raised tab
Unit
A Type : 442
A Type : 442
Outline
B Type : 434
B Type : 439
Ø65
Ø65
Ø65
Ø65
Installation Plate
Installation Plate
A Type B Type
A Type : 133
A Type : 95
175
217
B Type : 123
B Type : 170
(Unit : mm)
Drill a Hole in the Wall
- Drill the piping hole with a ø65mm hole core
drill. Drill the piping hole at either the right or
the left with the hole slightly slanted to the
outdoor side.
WALL
A-Type
Indoor
Outdoor
B-Type
Flaring Work
Main cause for gas leakage is due to defect of
flaring work. Carry out correct flaring work in
the following procedure.
Cut the pipes and the cable
Type "A" Screws
1
Use the piping kit accessory or the pipes
purchased locally.
2
Measure the distance between the indoor
and the outdoor unit.
3
Cut the pipes a little longer than measured
distance.
4
Cut the cable 1.5m longer than the pipe
length.
Copper
pipe
90°
Slanted Uneven Rough
Handle
Bar
Bar
Yoke
Cone
Copper pipe
Clamp handle
Red arrow mark
Check
1
Compare the flared work with the figure
by.
2
If a flared section is defective, cut it off
and do flaring work again.
Smooth all round
Inside is shiny without scratches
= Improper flaring =
Flare nut
Inclined
Surface
Cracked Uneven
damaged
thickness
Even length
all round
Connecting the Piping
1
Open the panel of the indoor unit.
2
Remove the chassis cover from the unit by
loosing 3 screws.
A
inch
mm
1/4
1.1~1.3
3/8
1.5~1.7
1/2
1.6~1.8
5/8
1.6~1.8
3/4
1.9~2.1
Chassis cover
3
Checking the Drainage
To check the drainage.
1
Pour a glass of water on the evaporator.
2
Ensure the water flows through the drain
hose of the indoor unit without any leak-
age and goes out the drain exit.
Connecting area
drain hose
Leakage
checking
Drain pan
Drain
hose
Leakage
checking
*The feature can be changed according a type
of model.
Drain piping
1
The drain hose should point downward for
easy drain flow.
Downward slope
Forming the Piping
In cases where the outdoor unit is installed
below the indoor unit perform the following.
1
Tape the piping, drain hose and connecting
Do not raise
cable from down to up.
2
Secure the tapped piping along the exterior
wall using saddle or equivalent.
Seal small openings
around pipings with a
Accumulated
gum type sealant.
drain water
Air
Taping
Drain hose
Waving
Tip of drain hose
Pipings
dipped in water
Connecting cable
(Conduit)
Ditch
Less than
50mm gap
Trap is required to prevent water
from entering into electrical parts.
*The feature can be changed according a type
of model.
7

Advertisement

loading

Summary of Contents for LG LSN-LSU-90-120HYV

  • Page 1 Ø65 Before installation, confirm the position of Installation Plate Installation Plate a screw between chassis and Installation A Type B Type LSN-LSU-90-120HYV TYPE : WALL MOUNTED plate. A Type : 133 A Type : 95 B Type : 123 B Type : 170...
  • Page 2 *The feature can be changed according to a type of model. - If you can’t meet above guide line in the seaside installation, please con- tact LG Electronics for the additional Required time for evacuation when 30 gal/h Soap water method anticorrosion.