ACDC Blade Pro Installation Instructions Manual page 4

Low glare, compact, linear led wallwash luminaire

Advertisement

Blade Pro: Step-By-Step Installation
1. Drill drainage holes,
In the bottom of the installation sleeve.
3. Placing the wiring for the fittings.
Install cables or draw wire through conduit before
laying concrete.
When looking at the object to be lit the starter cable
should be fed to the left of the fitting.
wall
Starter cable
5. Remove the peal strip.
acdc xxx
acdcxxx/10m
acdc xxx/20m
acdc xxx/50m
240v
4
Blade Pro Installation Instructions: Helpline +44 (0) 845 862 6400.
Link lead
*Product placement
2. Assemble the ground sleeve.
Contractor to supply conduit to suit location
Use minimum conduit size 1 1/2" or 35mm
to allow connector to pass through.
4. Prepare the ground and install installation sleeve.
The sleeve must be fully supported
from below and installed level.
6. Test Drainage.
Refer to guidelines on page 3.
7. Connect Cables.
Check the orientation of the fitting, as per the picture
shown.
Make sure the connectors click together to ensure the
IP seal.
Any cables not being connected must be capped
using the supplied bungs to ensure the IP rating
Paving or concrete
Concrete
Layers of drainage
material
INS211 Rev.2. 25.05.2018