11 GAS CONNECTION
1. Refit the gas cock.
2. Connect the gas supply to the gas pipe elbow.
The gas pipe should enter the boiler at the top LH side of
the boiler.
3. Table 2 gives details of the inlet connection size and the
minimum working pressures.

12 CASING ASSEMBLY

Unpack the control box from its carton and find the mains plug
strapped to the back of the box.
The boiler casing should now be fitted.
The jacket hardware pack contains all the screws required for assembly.
1. Fit support angles to the
collector hood and sump. The
angle with the hole for the
earth screw fits to the front.
Ensure the rear support angle
is fitted as shown.
2. Wire up the mains input cable
to
the
plug
provided.
Run this cable along the lower
clips (using the cable ties in the hardware pack) of the LH side panel with
the plug placed at the front.
3. Slide bottom of lower side panels on to studs on base tray.
4. Screw lower side panel to support angles.
Repeat for other side.
Concord CXC -
Installation
INSTALLATION
5. Fit clips to the top of each side panel.
6. Fit the spire clips to the side casing panels.
7. Hook on the control box to side panels.
8. Screw in self tapping screws at the bottom of the
control box to fix it to the side panels.
Push in the mains plug into the socket at the back
of the control box.