Download Print this page

BLAUBERG CIVIC EC LBE 300 Installation Manual page 4

Single-room heat recovery air handling unit
Hide thumbs Also See for CIVIC EC LBE 300:

Advertisement

MOUNTING OF RH, CO
The RH, CO
or VOC sensor must be installed in the return air duct.
2
Open the unit, disconnect the upper part of the protective housing and unscrew the holder that retains the inner partition box for the RH/CO
using a screwdriver. Disassemble the RH/CO
in the reverse order and install it on the holder inside of the unit. Update the control configuration after connection of the RH/CO
that.
RH sensor (DPWC112000) wiring
3
From the unit
2
controller
1
174 N. 36th Street, Lafayette, IN 47905
www.blauberg.us
e-mail: info@blauberg.us
OR VOC SENSOR FOR THE UNITS WITH S17 AND S18 AUTOMATION
2
/VOC sensor as described in the installation instruction and wire it according to the wiring diagram. Assemble the RH/CO
2
Holder
Sensor RH / СО
CO
sensor (DPWQ402000) wiring
2
supply voltage 24 V AC / DC
From the unit
GND
controller
Output 0-10 V
/ VOC
2
supply voltage 24 V AC / DC
3
GND
2
1
Output 0-10 V CO
xpm
2
/VOC sensor. Disconnect the socket
2
/VOC sensor. Contact the product Seller for doing
2
VOC sensor (DPWQ306000) wiring
2
From the unit
3
controller
1
/VOC sensor
2
GND
supply voltage 24 V AC / DC
Output air quality 0-10 V
MUI_BUSA142EN-03

Advertisement

loading