Download Print this page

BLAUBERG CIVIC EC LBE 300 Installation Manual page 2

Single-room heat recovery air handling unit
Hide thumbs Also See for CIVIC EC LBE 300:

Advertisement

min A
U-trap (hydraulic lock)
Condensate drain pipe
The levelling feet on the bottom of the unit ensure exact alignment of the unit during
mounting.
For alignment of the unit loosen the nuts and adjust position of the support disc manually
using a wrench. Then tighten the upper and the lower nut.
To attain the best performance of the unit and to minimise turbulence-induced air
pressure losses while mounting connect straight air duct sections to the unit spigots.
Minimum straight air duct length:
equal to 1 air duct diameter on outside side
equal to 3 air duct diameters on outlet side
If the air ducts are too short or not connected at any unit spigot, protect the unit inner
parts from ingress of foreign objects by installing a protecting grille or other protecting
device with mesh side width not more than 1/2 inch to prevent uncontrollable access to
the fans.
Fasteners for the unit mounting are not included into delivery set and should be ordered separately.
While selecting appropriate fasteners consider material of the mounting surface as well as the weigh of the unit, refer to the technical data. For selection of the fasteners for unit
mounting please refer to a service technician.
174 N. 36th Street, Lafayette, IN 47905
www.blauberg.us
e-mail: info@blauberg.us
Pipe
min 3
15
/
16
min 1
/
15
16
Sewage system
min B
min B
min 3°
СIVIC EC LB(E/E2)300
СIVIC EC LB(E/E2)300-E
СIVIC EC LB(E/E2)500
* the dimension may be increased during adjustment of the unit by means of the
levelling feet
12
/
15
model
a [inch]
23
31
329+
13
/
*
16
16
B [inch]
/
13
/
»
5
3
8
4
/
13
/
»
1
3
2
4
MUI_BUSA142EN-03

Advertisement

loading