Battery Operation; Light Socket Operation (110-125 Volts Dc Or Ac-25 To 60 Cycle Operation); Change Over - Zenith TRANS-OCEANIC H500 Operating Manual

Table of Contents

Advertisement

receiver chassis
and
insert
battery cable
plug
into receptacle pro-
vided
for
on
battery.
When
making
replacement
of the battery
pack
be
positive
to
use
only Zenith
built
Z985
battery pack.
2.
BATTERY OPERATION
A,
INSERT LINE
CORD PLUG
into the
Battery Saver
Switch
socket
on
top
rear of
chassis.
(See Figure
2.)
Figure
2.
Insertion
of Line
Cord
Plug
Into
Battery
Saver
Socket.
B.
Turn
the receiver
ON
by
rotating the
left
control
knob
clockwise.
When
not
in use,
always
make
certain that
power
is
off
by turning
the
left
control
knob
fully
counter
clockwise,
until a click
is
heard.
C.
Proceed
as
instructed
under paragraphs
10, 11, 12,
and
13.
D.
If
used an average
of
3 to
4 hours
a
day
30 hours
a
week,
the
battery will give
approximately 150 hours
of
service.
3.
LIGHT
SOCKET OPERATION
(110-1
25
Volts
DC
or
AC
25
to
60
cycle
operation.)
A.
Remove
the
line
cord plug
from
CHANGE
OVER
socket.
Removal
of
this
plug
automatically
trips
the Battery Saver
Switch
and
pre-
vents battery drain
while operating
off
light
socket operation.
B.
Plug
the
line
cord
into
any convenient
light socket.
After the
receiver
is
in
operation
try
reversing the
plug
for
minimum
hum
or noise
when
operating
on
alternating current.
C.
On
direct
current reverse the
plug
if
the
set
does not operate

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents