4.1 Introduction

4.2 Fill the reservoir

1
2
3
4
5
+
[EN] English - K0457
Chapter 4:
Chapter 1 gives a description of the different parts of the
instrument:
to
1
13
This chapter gives examples of how to connect and use the
PV 623 pressure station to give the necessary hydraulic
pressure conditions.
Before you start:
Read and understand the "Safety" section.
Make sure that there is no damage to the instrument, and
that there are no missing items.
Note: Use only original parts supplied by the manufacturer.
Caution: Ice in the pressure mechanism can cause
damage. If the temperature is less than 4°C (39°F), drain
all water from the instrument.
The first time you want to use the hydraulic pressure station,
use this procedure to fill the reservoir:
Step
Procedure
1.
Use the applicable adaptor to attach the device
(Section 4.4).
2.
Remove the hydraulic pressure release valve.
3.
Use the refill bottle to add the necessary hydraulic
*
fluid
but leave a small air gap.
4.
To remove air from the pressure mechanism, wind the
volume adjuster through one full cycle
(counterclockwise then clockwise).
5.
Seal the system and continue with the normal
pressure operation; see Section 4.6.
* Refer to Chapter 7 (Specification)
After a period of operation, if it is necessary to add more fluid to
the reservoir, use this procedure again.
To add more fluid during a pressure procedure, refer to
Section 4.6.2.
To drain the hydraulic fluid, refer to Section 4.7.
Hydraulic pressure
operation (PV 623)
Hydraulic pressure operation (PV 623) 4-1
2
4
4
9
4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Druck pv 621Druck pv 623

Table of Contents