EPS 305 Installation & Parts Manual

Token station

Advertisement

Quick Links

MODEL 305
TOKEN STATION
INSTALLATION & PARTS
MANUAL
ENGINEERED PARKING SYSTEMS
25010 AVENUE TIBBITTS
VALENCIA, CA 91355
(661) 294-0778
(800) 377-4636
www.epsinfo.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 305 and is the answer not in the manual?

Questions and answers

Summary of Contents for EPS 305

  • Page 1 MODEL 305 TOKEN STATION INSTALLATION & PARTS MANUAL ENGINEERED PARKING SYSTEMS 25010 AVENUE TIBBITTS VALENCIA, CA 91355 (661) 294-0778 (800) 377-4636 www.epsinfo.com...
  • Page 2: General Information

    GENERAL INFORMATION: WARRANTY: All equipment manufactured by Engineered Parking Systems is warranted against defects in material and workmanship for one full year from date of shipment. All equipment is tested and inspected before shipment. The warranty covers repair or replacement of any part which fails under normal usage.
  • Page 3 ADJUSTMENT All Ultimechs are adjusted at the factory for maximum performance and no adjustment should be necessary. If the mech has been disassembled or if more critical adjustments are desired, the following adjustment procedure is recommended (make sure that the mech is upright and level): GATE To adjust for slightly thicker coins or improve acceptance.
  • Page 4 PARTS LIST MODEL 305 TOKEN STATION QUANTITY PART NUMBER DESCRIPTION 205-3* .900 TOKEN ACCEPTOR 205-4* .984 TOKEN ACCEPTOR 205-9 .900 ACCEPTOR WI FRONT PLATE 205-10 .984 ACCEPTOR WI FRONT PLATE 492-41 (42-7087-00) VEND SWITCH & WIRE ASSY. 306-6 PEDESTAL (MOUNTING POST) 36”...

Table of Contents