Page 1
Installation Manual for M Installation Manual for M-G014 & M G014 & M-G015 M-G014 M-G015...
Page 2
Contents 1. Electrical specifications 2. Plumbing 3. Installation of Water connections 4. Installation of Drain 5. Operation of Bathtub 6. Troubleshooting 7. Cleaning and Maintenance GENERAL INFORMATION Note: All tubs need to be leveled in its final resting position and have all feet touching the ground.
Page 3
Electrical Parameters Voltage of Control Rated Voltage Frequency Motor Power Circuit 110V~120v 0.745KW(1HP)/1.0KW 60HZ DC12V 5.5-6.5 Amps Electrical Requirements 1 dedicated 12-2 or 12-3 line for water pump (line 1, ground and neutral) 110 volt, 15-20 amp GFCI breaker ...
Page 4
Installation of Water Inlet Connect one T-piece in the bathroom near the bathtub and then install two switches. Connect the outlet of the switches with the cold and hot water pipes of the water heater. Refer to the below diagram. Installation of Drain Below is a diagram if flexible hose is used:...
Page 5
Operation of Bathtub 1. Check the power supply and Check the power supply and GFCI protection. Insert the bathtub plug into an interior protection. Insert the bathtub plug into an interior power supply socket or hardwire in a work box. or hardwire in a work box.
Page 6
Cleaning and Maintenance 1. Clean the bathtub with ordinary liquid detergent and a soft cloth. Don’t sterilize the bathtub with cleaning products containing acetone or ammonia. Do not disinfect using agents with formic acid or formaldehyde. 2. If scratched treat the surface with an acrylic rubbing polish. 3.
Need help?
Do you have a question about the M-G014 and is the answer not in the manual?
Questions and answers