Cabling Guidelines - Cisco Catalyst 2900 Series Hardware Installation Manual

Xl modules
Hide thumbs Also See for Catalyst 2900 Series:
Table of Contents

Advertisement

LEDs
LEDs

Cabling Guidelines

10/100 Module
Catalyst 2900 Series XL Modules Hardware Installation Guide
1-8
An LED above or next to each port reflects the port status, as described in
Table 1-3.
Table 1-3
Port LEDs
Color
Meaning
Off
No link.
Green
Link present.
Flashing
Activity; port is transmitting or receiving data.
green
Alternating
The port is experiencing error frames that can affect
green-amber
connectivity. The port monitors errors such as excessive
collisions, cyclic redundancy check (CRC) errors, and alignment
errors.
Amber
Port is not forwarding because
It is initializing
It was disabled by management or by an address violation
It was blocked by Spanning Tree Protocol
This section describes the cabling guidelines you need to consider when planning
your network.
The 10/100 ports require Category 5 UTP cabling. Attached devices must be
within 100 meters of the port and be either 10BaseT or 100BaseTX compatible.
Chapter 1
Overview
78-5912-03

Advertisement

Table of Contents
loading

Table of Contents