Putting Your Water Computer Into Operation - Gardena C1060 Profi Operating Instructions Manual

Water computer
Hide thumbs Also See for C1060 Profi:
Table of Contents

Advertisement

4. Putting Your Water Computer into Operation

Insert battery:
This Water Computer must only be powered by a 9 V alkaline
manganese (alkaline) battery type IEC 6LR61.
1. Press unlock button
I
unit
2. Insert battery
compartment.
Ensure that the battery polarity
H
correct.
The display shows all the LCD-symbols
for 2 seconds and then moves to the
time / day of week level.
3. Re-insert control unit
Programming aid :
v Stick the self-adhesive programming
aid on the inside of the display cover
The display cover can be folded up to protect the display against
the weather.
J
z
P
8
H
and pull control
out of the Water Computer housing.
J
into battery
is
P
I
in housing.
z
D
.
D
Connect Water Computer :
K
L
I
M
Compile watering plan :
The Water Computer is fitted with a sleeve nut
G 1" (33.3 mm) thread. The adaptor supplied
Water Computer to be connected to taps with a G 3 /4" thread
(26.5 mm).
Connect Water Computer to water tap with G 1" (33.3 mm)
thread :
L
1. Screw sleeve nut
of the Water Computer on to the tap
thread by hand (do not use pliers).
M
2. Screw tap connector
on to the Water Computer.
Connect Water Computer to tap with G 3 /4" (26.5 mm) thread :
K
1. Screw adaptor
on to the tap manually (do not use pliers).
L
2. Screw sleeve nut
of the Water Computer on to the adaptor
K
thread
by hand (do not use pliers).
M
3. Screw tap connector
on to the Water Computer.
Before you start entering the watering data in the computer
we recommend that you write the data on one of the watering
plans in the appendix to maintain more of an overview.
L
for taps with
K
allows the
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents