Elementar Analysensysteme GmbH vario EL cube Operating Instructions Manual page 111

Table of Contents

Advertisement

7 - Chlorine determination with EC cell
As displayed below, mount the seal with connection to the free end of the hose line no. 300 and
connect the hose line to the inlet of the EC cell (10).
Shift the heat protection case (100) over the absorber tube.
Mount the tube no. 115 (160) between the pan (large) of the O
(small) of the ball valve.
Push the furnace into the instrument and close the bayonet catch at the ball valve.
Close the left heater of the furnace by means of the blind plug (170). Insert the quad ring (190)
into the blind pan (180) and close the O
Variants Operating Instructions vario EL cube
2
inlet with the blind pan.
2
©Elementar Analysensysteme GmbH
supply and the ball connector
111

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the vario EL cube and is the answer not in the manual?

Table of Contents

Save PDF