Geostar Arbor Base Series Installation Manual page 24

Water source/geothermal heat pump
Table of Contents

Advertisement

ARBOR BASE SERIES INSTALLATION MANUAL
Blower Performance Data cont.
Variable Speed ECM Motor
Max
Blower
Motor
Model
ESP
Size
015
0.50
9 x 7
018
0.50
9 x 7
024
0.50
9 x 7
030
0.50
9 x 7
036
0.50
9 x 7
041
0.50
9 x 7
042
0.50
11 x 10
048
0.50
11 x 10
060
0.75
11 x 10
070
0.75
11 x 10
Factory settings are at recommended L-M-H DIP switch locations
CFM is controlled within ±5% up to the maximum ESP
M-H settings MUST be located within boldface CFM range
Max ESP includes allowance for wet coil and standard fi lter
Lowest and Highest DIP switch settings are assumed to be L and H respectively
Setting Blower Speed - Variable Speed ECM
Variable speed ECM blower motors have 12 selectable speeds and are factory set for optimum performance. When applicable, the speed
settings may also be adjusted through the Building Automation System (BAS).
CAUTION: Disconnect all power before performing this operation.
hp
1
2
3
300
400
500
1/2
L
300
400
500
1/2
L
400
500
1/2
L
400
500
1/2
L
400
500
1/2
400
500
1/2
500
600
700
1/2
L
500
600
700
1/2
600
800
1000
1
L
600
800
1000
1
L
Air Flow Dip Switch Settings
4
5
6
7
600
700
800
M
H
600
700
800
M
H
600
700
800
900
M
H
600
700
800
900
M
600
700
800
900
L
M
600
700
875
1050
L
M
875
1050
1150
1250
M
875
1050
1150
1250
L
1300
1500
1750
1950
M
H
1300
1500
1750
1950
M
24
8
9
10
11
1000
1100
1000
1100
H
1000
1100
1200
H
1150
1250
1325
1375
H
1325
1375
1475
1550
H
1325
1375
1475
1550
M
H
2100
2200
2300
2100
2200
2300
H
12
1600
10/15/15

Advertisement

Table of Contents
loading

Table of Contents