Lcd Setting - INFOSEC G1 Solar MPPT User Manual

Inverter solar mppt charger
Table of Contents

Advertisement

LCD Setting

After pressing and holding ENTER button for 3 seconds, the unit will enter setting mode. Press "SELECT"
button to select setting programs. And then, press "ENTER" button to confirm the selection or ESC button to
exit.
Setting Programs:
Program
Description
00
Exit setting mode
Output source priority:
01
To configure load power
source priority
17
INFOSEC UPS SYSTEM - 15, rue du Moulin - 44880 Sautron - FRANCE - www.infosec-ups.com
Hot Line – Tel + 33 (0)2 40 76 15 82 - Fax + 33 (0)240 94 29 51 - hotline@infosec.fr – 08 17 AA 59 201 05
Selectable option
Escape
Solar energy provides power to the
loads as first priority.
If solar energy is not sufficient to
power all connected loads, battery
energy will supply power the loads at
Solar first
the same time.
Utility provides power to the loads only
when any one condition happens:
- Solar energy is not available
- Battery voltage drops to either
low-level warning voltage or the
setting point in program 12.
Utility will provide power to the loads
as first priority.
Utility first (default)
Solar and battery energy will provide
power to the loads only when utility
power is not available.
Solar energy provides power to the
loads as first priority.
If solar energy is not sufficient to
power all connected loads, battery
SBU priority
energy will supply power to the loads
at the same time.
Utility provides power to the loads only
when battery voltage drops to either
low-level warning voltage or the
setting point in program 12.

Advertisement

Table of Contents
loading

Table of Contents