Connection to the terminals
Make connections in the following manners as shown below.
• Appropriate tightening torque: 0.8 to 1.2 N · m
(8.2 to 12.2 Kgf · cm)
4
Confirmation of wiring
After making connections, make sure whether or not there is any improper wiring.
-�ffitW
Short-circuiting load circuits may cause failure.
Considerations after installation
• Confirmation of operation
Read the instruction manual thoroughly to make sure of operation.
Since the nickel-metal-hydride battery of the main unit may not be charged sufficiently due to self
discharge, especially a power failure test should be conducted two days or later after turning on the
power.
• Explanation of specifications to users
When you configure a system with external equipment using control output or melody signal
output, it is necessary to make up a program according to it. Be sure to present the following
information to users in a written form:
• System schematic diagram
• Programming method
-�MtW
1. Turn off the power before make connections.
2. In the case of two crimping wires, make
connections back to back as shown below.
3. Do not connect three or more electric wires
to one terminal.
Failure to observe this precaution may
cause heat generation or fire due to
incomplete contact.
-34-