Considerations After Installation; Confirmation Of Operation; Explanation Of Specifications To Users; Connection To The Terminals - Panasonic Melody Week Instruction & Installation Manual

Office clock (electronic bell timer with recording function)
Table of Contents

Advertisement

" 3

Connection to the terminals

Make connections in the following manners as shown below.
• Appropriate tightening torque: 0.8 to 1.2 N · m
(8.2 to 12.2 Kgf · cm)
4
Confirmation of wiring
After making connections, make sure whether or not there is any improper wiring.
-�ffitW
Short-circuiting load circuits may cause failure.

Considerations after installation

• Confirmation of operation

Read the instruction manual thoroughly to make sure of operation.
Since the nickel-metal-hydride battery of the main unit may not be charged sufficiently due to self­
discharge, especially a power failure test should be conducted two days or later after turning on the
power.

• Explanation of specifications to users

When you configure a system with external equipment using control output or melody signal
output, it is necessary to make up a program according to it. Be sure to present the following
information to users in a written form:
• System schematic diagram
• Programming method
-�MtW
1. Turn off the power before make connections.
2. In the case of two crimping wires, make
connections back to back as shown below.
3. Do not connect three or more electric wires
to one terminal.
Failure to observe this precaution may
cause heat generation or fire due to
incomplete contact.
-34-

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Td736Td738Td739

Table of Contents