Physical Installation Requirements - Nortel 7220 Installing Manual

Hide thumbs Also See for 7220:
Table of Contents

Advertisement

DRAFT March 24th-2005
2

Physical installation requirements

Physical installation requirements
The Wireless AP 7220 unit is designed to be installed vertically with the baseplate
facing down (in indoor or outdoor locations). The unit must be installed in
accordance with pre-installation activities, site survey, local electrical codes and
regulatory requirements. Record the serial number and the location of each unit.
These records are required for subsequent network management and maintenance.
Location
When installing the Wireless AP 7220 unit choose a location that:
provides a minimum separation of 0.5 metre from all persons during normal
operation for units installed using integral 5GHz (13 and 18 dBi)antennas
with integral or external 2.4GHz antennas for regulatory compliance.
provides a minimum separation of 1 metre from all persons during normal
operation for units installed using optional approved external 5GHz (23 dBi)
antennas for regulatory compliance.
approved external 5GHz antennas (13 dBi and 18 dBi) are qualified for indoor
and outdoor use except for the 23 dBi which is qualified for outdoor
installation only.
minimizes the possibility of vandalism or accidental harm to the unit.
has line of sight with neighboring units.
Supplying AC power
The Wireless AP 7220 must be powered from AC supplies in the range
100V-240V and 45Hz-65Hz. A continuous supply of power is required for
operation of the unit.
318527-A Rev 01

Advertisement

Table of Contents
loading

Table of Contents