IMPORTANT: The installation of your TED Pro Home system is a several-step process. The 1st step is the installation of the MTU Home. After the MTU Home is installed, Step 2 is the installation of the ECC, and the last Step ... Footprints software.
Footprints Dashboard. (See Page 11 for more diagnostics) Accessing TED FOOTPRINTS Plug the Ethernet cable from the ECC into the router or network drop and find the ECC IP address on your network, using one of the following methods: From your computer desktop: Go to http://www.theenergydetective.com/downloads-documents...
• MTU Home and MTU Pro Lite utilize Power Line Communication (PLC) to transmit Energy data to the ECC. If you require Ethernet communication for your application, please see specifications for TED Pro MTU at www.theenergydetective.com • MTU Home and MTU Pro Lite are suitable for use with solar/wind generation systems. You will need to purchase one additional MTU Home.
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * SYSTEM COMPONENTS Unpacking Unpack TED and ensure that all parts are included in the package. A) One (1) Measuring Transmitting Unit (MTU Home) B) One (1) ECC (Energy Control Center).
HELP Section of the TED Footprints Software, or see Support at: www.theenergydetective.com Every effort has been made in providing for the safe, secure installation of TED. The installation of TED requires the cover of the main electrical circuit breaker panel to be removed. After the circuit breaker panel cover has been removed, the potential hazard of shock, burn, or even electrocution now exists.
Page 7 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * P A R T I I I –...
Page 8
Page 8 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Red polarity dots facing Utility I n s t a l l a t i o n Procedure...
Page 9
Page 9 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * E) If there is no spare circuit breaker, the black wires can be attached to any 15, 20 or 30 Amp single pole circuit breaker in the panel, provided that the circuit breaker is approved for 2 conductors and this is acceptable to the “authority having jurisdiction in the installation...
Page 10
Do not close the electrical panel until you have completed the installation of the ECC and verified that correct data is being received from the MTU. Close the Electrical Panel only after you have confirmed the correct operation of the TED Pro system.
Need help?
Do you have a question about the pro home and is the answer not in the manual?
Questions and answers