Insignia INS8058L Installation Manual

Hide thumbs Also See for INS8058L:

Advertisement

Quick Links

INSTALLATION MANUAL
INS8058L
ATTENTION INSTALLERS:
These instructions must be
left with the customer
insigniarange.com
CHECK ALL CONTENTS BEFORE BUILD COMMENCES. NO RETURNS CAN BE MADE
ONCE THE BUILD HAS STARTED AS IT IS DEEMED ACCEPTANCE OF PRODUCT!
WARRANTY REG NO: __________________________
To claim your full 5 year warranty, register your shower within 90 days of delivery at: www.insigniarange.co.uk/
warrantyreg.aspx. Standard 12 month warranty applies if outside this time period.
Last Modified:27/01/2017
www.insigniarange.co.uk
30 Day Technical Support:
(NOTE: This service is only available to customers from the day of delivery,
please have your supplier's details and your postcode to hand before calling)
Replacements Parts:
inside of your warranty contact:
www.insigniarange.co.uk/customerService.aspx
Spares/Replacements Parts:
outside of your warranty
contact 0844 800 3069
01908 226545

Advertisement

Table of Contents
loading

Summary of Contents for Insignia INS8058L

  • Page 1 INSTALLATION MANUAL 30 Day Technical Support: 01908 226545 INS8058L (NOTE: This service is only available to customers from the day of delivery, please have your supplier’s details and your postcode to hand before calling) Replacements Parts: inside of your warranty contact: www.insigniarange.co.uk/customerService.aspx...
  • Page 2 Last Modified:27/01/2017 Thank you for your recent purchase of an Insignia shower. Please read this booklet with great care to ensure you get the best out of your build and have a shower that will last for many years to come!
  • Page 3: Table Of Contents

    insigniarange.com Last Modified:27/01/2017 Contents Introduction Electrical Requirements What’s In The Boxes? Screw Pack Contents Plumbing Requirements Schematics Starting The Installation Electric Box Connections Steam Generator Connections Sealing and Water Testing SUN Control Panel Instructions Help Book Information Parts list...
  • Page 4 DURING BUILD, LIKE ALL SHOWERS CORRECT SEALING IS IMPERATIVE. If you are using Insignia’s RubberGum, please ensure the product does not come in contact with your silicone as this will cause the RubberGum to fail and will not adhere as intended.
  • Page 5 insigniarange.com Last Modified:27/01/2017 TOTAL ELECTRICAL REQUIREMENTS Voltage Rating 220 -240AC Frequency Rating 50HZ Power Rating 2.8KW Your electrical contractor should understand ALL legal requirements of connection before undertaking any work or installation. UNDER NO CIRCUMSTANCES UNDERTAKE THIS YOURSELF!!! Note for electrician. This product comes with 13 amp plug(s) fitted with an RCD unit. We leave it this way for you to connect this your own way due to continued additions to current regulations.
  • Page 6 insigniarange.com Last Modified:27/01/2017 Tool Requirements None Supplied Scissors Stanley Blade Silicone Gun Spirit Level Tape Measure Philips Screwdriver Electric Drill Adhesive Requirements Bacteria Resistant Sanitary Silicone - (for vertical joints) Plumbers Mait (for waste joints) Not Supplied Not Supplied Hardware Requirements A Steam Shower requires 3 x 1 Metre Braided Hose Not Supplied...
  • Page 7: What's In The Boxes

    insigniarange.com Last Modified:27/01/2017 Whilst the next steps show you how to assemble your shower we want to make sure you have a correct build to ensure you get a trouble free shower. Therefore our advice is to follow the instructions and perform a dry run to ensure you are confident with the build and you understand fully how the unit is assembled. When we use the word “DRY RUN”...
  • Page 8 Drill Piece VERY IMPORTANT VERY IMPORTANT Have you got everything? If not please contact the Insignia Support Line on 01908 226545. Remember Have you got everything? If not please contact the Insignia Support Line on 01908 226545. Remember NEVER NEVER...
  • Page 9 insigniarange.com Last Modified:27/01/2017 Pressure Requirements from your house supply We recommend a bar pressure between 2.5 and 3.4 BAR. If you have a combi boiler system no problem should be experienced. If you have a gravity feed older type installation (hot water tank type usually less than 1 bar) you will almost certainly need a pump. We cannot advise on which type of pump is used, location or design because all house plumbing layouts vary.
  • Page 10 insigniarange.com Last Modified:27/01/2017...
  • Page 11 insigniarange.com Last Modified:27/01/2017 TO START Make sure you have a clear space, remember when finished and in place you need access to check your build and able to pull the shower out for servicing or should you have the need to replace anything! Take the shower tub and remove all the protective wrapping and fit the waste.
  • Page 12 insigniarange.com Last Modified:27/01/2017 Step 2 (please note, if your column has a rubber seal at the bottom , take the rubber off and apply silicone inside the rubber and replace) Step 2 Again, Once you have completed a dry run and are happy, Then continue to apply the silicone to the specified area of the control column and place next to the angled back glass panel and fix together using the ST20 screws.
  • Page 13 insigniarange.com Last Modified:27/01/2017 Step 4 Now lock the front angled glass panel to the side glass panel by following the position shown in the image marked “1” Once you have met the back panel inside the front upright as per the close up image walk the panel around to the position shown in the image marked “2”...
  • Page 14 insigniarange.com Last Modified:27/01/2017 Step 6 Lower the top curved rail into position and screw from the rear side as per the image using the ST35 screws. Fix the front of the top curved rail onto the upright of the front fixed angled glass. Please note in order to do this you will need to slide up the front fixed panel roughly 3 inches to expose the screw holes.
  • Page 15 insigniarange.com Last Modified:27/01/2017 Step 8 Step 8 Now apply silicone to the bottom of the remaining curved rail and place into position as shown in the diagram and fix this into place using the ST35 screws and ST25 screws Please note that when drilling the holes to take the screws this is at a depth no deeper than 5mm.
  • Page 16 insigniarange.com Last Modified:27/01/2017 Step 10 Insert remaining upright to the left of the curved glass panel. Drill and screw this into position using the ST20 screws and once fixed slide the flat rubber glass seal into this newly fitted upright on the inside (as of the green line in the image) Please Note: ensure you drill no deeper than 5mm.
  • Page 17 insigniarange.com Last Modified:27/01/2017 Step 12 Step 12 Pierce through the holes using a screwdriver to show pre-cut holes in the glass as indicated in the image. Now repeat the process from step 11 to secure the roof to the glass panels Step 13 Step 13 Align the shower roof to your side panels and when you are happy with the...
  • Page 18 insigniarange.com Last Modified:27/01/2017 Accessory Installation Please Note Ensure all grey backing film on the rear of the glass panels are pierced through the existing glass holes with a knife to provide an efficient smooth fitting and location of the accessories. We recommend using a screwdriver on the smaller holes. Shelf Fix the chrome floating shelf brackets to your glass back panel by using the provided screws.
  • Page 19 insigniarange.com Last Modified:27/01/2017 Hand Shower Attach the chrome riser bar to the glass wall ensuring the water inlet is inserted through the lower large hole and hand tightened from the rear side. Now tighten the chrome shower holder ensuring that this will take the hand shower itself without falling (please note over tightening will prevent the holder from sliding up and down) Thermostatic Probe...
  • Page 20 insigniarange.com Last Modified:27/01/2017 Door Seals Magnetic Seal: Push the magnetic door seal on the handle side of the glass door ensuring this is tightly fitted. Rear Door Seal: Place the rear door seal on the opposite side to the magnetic strip ensuring the flap is facing the fixed glass panel Handle Ensuring that the inner thread is protruding out from the handle far enough, place the handle on the...
  • Page 21 Monsoon Shower Hand Shower Device output may differ from the image. Please refer to your outer chrome faceplate inside your Insignia shower as a reference point. Body Jets Bath Filler IF YOUR DIAL DOES NOT CORRESPOND TO THE APPROPRIATE DEVICE: Turn on your water to the shower and note which output the water exits from then turn off the water and swap over the relevant hose.
  • Page 22: Electric Box Connections

    insigniarange.com Last Modified:27/01/2017 Electric Box Connections Connect the cables below to the corresponding devices on the shower Roof Light Antenna Speaker Speaker Thermostatic probe 12V power Supply...
  • Page 23: Steam Generator Connections

    insigniarange.com Last Modified:27/01/2017 Steam Generator Connections The steam generator has 3 connections. Steam Outlet: Connect the white insulated hose to the white steam pod within your shower. Make sure these are fitted in the correct positio n as they are only attached for transportation reasons only. Water Inlet: Connect a braided hose from the shower valve’s centre feed to this opening.
  • Page 24 insigniarange.com Last Modified:27/01/2017 Roof Lights The roof lights come packed in with your accessories and need to be inserted on site. On top of the roof there are 24 nuts, which simply need tightening by hand. Once this is done, the lights simply push onto the fitting.
  • Page 25 insigniarange.com Last Modified:27/01/2017 Roof cover After installing the LED light fixtures place the roof cover over the led cables as shown in the diagram.
  • Page 26 insigniarange.com Last Modified:27/01/2017 Safety precautions Safety precautions Never leave children unattended in the shower or bath. Never leave children unattended in the shower or bath. Never bath children (under 12) using whirlpool function if fitted. Never bath children (under 12) using whirlpool function if fitted. Regulate the temperature of water before showering Regulate the temperature of water before showering Never allow children to use the steam function.
  • Page 27 insigniarange.com Last Modified:27/01/2017 Silicone Seal (vertical joints) shown in red on the inside of the shower TESTING FOR WATER LEAKS LEAVE THE SHOWER 24 HOURS AFTER BUILD TO ALLOW SEALENT TO CURE AND ENSURE THE SHOWER IS AWAY FROM ITS FINAL POSITION TO ALLOW REAR VIEWING Ensure all connections are tight and sealed including the waste, body jets and steam outlet (model dependent) on your shower.
  • Page 28 Then simply go on your device and pair up with the shower which will be named as “INS”. please search for “Insignia Showers” on YouTube and find our “SUN While your Bluetooth device is connected, use the music function button to pause and resume your Control Panel”...
  • Page 29 insigniarange.com Last Modified:27/01/2017 Control Panel Instructions Connecting to Bluetooth Step2 Step1 Then simply go on your device and To connect a device via pair up with the shower which should be shown as “INS”. Once this is Bluetooth, press the music complete you will hear a beep to function button twice (which signify you’re connected and ready to...
  • Page 30 Once your control panel has been switched off the 03 system will automatically start and you will see “03” on your control panel. To see our tutorial videos for operating this control panel’s features, please search for “Insignia Showers” on YouTube and find our “SUN Control Panel” Playlist, or you can click here...
  • Page 31 Last Modified:27/01/2017 Need Help? If so then simply download Insignia’s free comprehensive help and troubleshooting brochure now! Simply visit: www.insigniarange.co.uk/help.aspx...
  • Page 32: Last Modified:27/01/2017

    Part Code Part Description SP037 Speaker cover Part Code Part Description SP027 Monsoon Shower head SP042 SUN Control panel INS8058L-4 Column (Blank) SP078 Ozone Module (for Steam SP227 Microphone style hand INS8058L-7 Top & Bottom Door Rail Showers) shower INS8058L-6...
  • Page 33 All images are subject to copyright. Images may not be used in any way shape or form with out written permission from Maclean International Ltd. Images are NOT permitted to be saved, printed or uploaded. Violation of copyright laws are punishable by law. Insignia™ is a registered trademark of Maclean International Ltd...
  • Page 34 insigniarange.com Last Modified: 27/01/2017 www.insigniarange.co.uk INSTALLATION MANUAL 30 Day Technical Support: 01908 226545 INS8058R (NOTE: This service is only available to customers from the day of delivery, please have your supplier’s details and your postcode to hand before calling) Replacements Parts: inside of your warranty contact: www.insigniarange.co.uk/customerService.aspx Spares/Replacements Parts:...
  • Page 35 Last Modified: 27/01/2017 Thank you for your recent purchase of an Insignia shower. Please read this booklet with great care to ensure you get the best out of your build and have a shower that will last for many years to come!
  • Page 36: Electrical Requirements

    insigniarange.com Last Modified: 27/01/2017 Contents Introduction Electrical Requirements What’s In The Boxes? Screw Pack Contents Plumbing Requirements Schematics Starting The Installation Electric Box Connections Steam Generator Connections Sealing and Water Testing SUN Control Panel Instructions Help Book Information Parts list...
  • Page 37 DURING BUILD, LIKE ALL SHOWERS CORRECT SEALING IS IMPERATIVE. If you are using Insignia’s RubberGum, please ensure the product does not come in contact with your silicone as this will cause the RubberGum to fail and will not adhere as intended.
  • Page 38 insigniarange.com Last Modified: 27/01/2017 TOTAL ELECTRICAL REQUIREMENTS Voltage Rating 220 -240AC Frequency Rating 50HZ Power Rating 2.8KW Your electrical contractor should understand ALL legal requirements of connection before undertaking any work or installation. UNDER NO CIRCUMSTANCES UNDERTAKE THIS YOURSELF!!! Note for electrician. This product comes with 13 amp plug(s) fitted with an RCD unit. We leave it this way for you to connect this your own way due to continued additions to current regulations.
  • Page 39 insigniarange.com Last Modified: 27/01/2017 Tool Requirements None Supplied Scissors Stanley Blade Silicone Gun Spirit Level Tape Measure Philips Screwdriver Electric Drill Adhesive Requirements Bacteria Resistant Sanitary Silicone - (for vertical joints) Plumbers Mait (for waste joints) Not Supplied Not Supplied Hardware Requirements A Steam Shower requires 3 x 1 Metre Braided Hose Not Supplied...
  • Page 40: What's In The Boxes

    insigniarange.com Last Modified: 27/01/2017 Whilst the next steps show you how to assemble your shower we want to make sure you have a correct build to ensure you get a trouble free shower. Therefore our advice is to follow the instructions and perform a dry run to ensure you are confident with the build and you understand fully how the unit is assembled. When we use the word “DRY RUN”...
  • Page 41 Drill Piece VERY IMPORTANT VERY IMPORTANT Have you got everything? If not please contact the Insignia Support Line on 01908 226545. Remember Have you got everything? If not please contact the Insignia Support Line on 01908 226545. Remember NEVER NEVER...
  • Page 42 insigniarange.com Last Modified: 27/01/2017 Pressure Requirements from your house supply We recommend a bar pressure between 2.5 and 3.4 BAR. If you have a combi boiler system no problem should be experienced. If you have a gravity feed older type installation (hot water tank type usually less than 1 bar) you will almost certainly need a pump.
  • Page 43 insigniarange.com Last Modified: 27/01/2017...
  • Page 44 insigniarange.com Last Modified: 27/01/2017 TO START Make sure you have a clear space, remember when finished and in place you need access to check your build and able to pull the shower out for servicing or should you have the need to replace anything! Take the shower tub and remove all the protective wrapping and fit the waste.
  • Page 45 insigniarange.com Last Modified: 27/01/2017 Step 2 (please note, if your column has a rubber seal at the bottom , take the rubber off and apply silicone inside the rubber and replace) Step 2 Again, Once you have completed a dry run and are happy, Then continue to apply the silicone to the specified area of the control column and place next to the angled back glass panel and fix together using the ST20 screws.
  • Page 46 insigniarange.com Last Modified: 27/01/2017 Step 4 Now lock the front angled glass panel to the side glass panel by following the position shown in the image marked “1” Once you have met the back panel inside the front upright as per the close up image walk the panel around to the position shown in the image marked “2”...
  • Page 47 insigniarange.com Last Modified: 27/01/2017 Step 6 Lower the top curved rail into position and screw from the rear side as per the image using the ST35 screws. Fix the front of the top curved rail onto the upright of the front fixed angled glass. Please note in order to do this you will need to slide up the front fixed panel roughly 3 inches to expose the screw holes.
  • Page 48 insigniarange.com Last Modified: 27/01/2017 Step 8 Step 8 Now apply silicone to the bottom of the remaining curved rail and place into position as shown in the diagram and fix this into place using the ST35 screws and ST25 screws Please note that when drilling the holes to take the screws this is at a depth no deeper than 5mm.
  • Page 49 insigniarange.com Last Modified: 27/01/2017 Step 10 Insert remaining upright to the left of the curved glass panel. Drill and screw this into position using the ST20 screws and once fixed slide the flat rubber glass seal into this newly fitted upright on the inside (as of the green line in the image) Please Note: ensure you drill no deeper than 5mm.
  • Page 50 insigniarange.com Last Modified: 27/01/2017 Step 12 Step 12 Pierce through the holes using a screwdriver to show pre-cut holes in the glass as indicated in the image. Now repeat the process from step 11 to secure the roof to the glass panels Step 13 Step 13...
  • Page 51 insigniarange.com Last Modified: 27/01/2017 Accessory Installation Please Note Ensure all grey backing film on the rear of the glass panels are pierced through the existing glass holes with a knife to provide an efficient smooth fitting and location of the accessories.
  • Page 52 insigniarange.com Last Modified: 27/01/2017 Hand Shower Attach the chrome riser bar to the glass wall ensuring the water inlet is inserted through the lower large hole and hand tightened from the rear side. Now tighten the chrome shower holder ensuring that this will take the hand shower itself without falling (please note over tightening will prevent the holder from sliding up and down) Thermostatic Probe...
  • Page 53 insigniarange.com Last Modified: 27/01/2017 Door Seals Magnetic Seal: Push the magnetic door seal on the handle side of the glass door ensuring this is tightly fitted. Rear Door Seal: Place the rear door seal on the opposite side to the magnetic strip ensuring the flap is facing the fixed glass panel Handle Ensuring that the inner thread is protruding out from the handle far enough, place the handle on the...
  • Page 54 Monsoon Shower Hand Shower Device output may differ from the image. Please refer to your outer chrome faceplate inside your Insignia shower as a reference point. Body Jets Bath Filler IF YOUR DIAL DOES NOT CORRESPOND TO THE APPROPRIATE DEVICE: Turn on your water to the shower and note which output the water exits from then turn off the water and swap over the relevant hose.
  • Page 55: Electric Box Connections

    insigniarange.com Last Modified: 27/01/2017 Electric Box Connections Connect the cables below to the corresponding devices on the shower Roof Light Antenna Speaker Speaker Thermostatic probe 12V power Supply...
  • Page 56: Steam Generator Connections

    insigniarange.com Last Modified: 27/01/2017 Steam Generator Connections The steam generator has 3 connections. Steam Outlet: Connect the white insulated hose to the white steam pod within your shower. Make sure these are fitted in the correct positio n as they are only attached for transportation reasons only. Water Inlet: Connect a braided hose from the shower valve’s centre feed to this opening.
  • Page 57 insigniarange.com Last Modified: 27/01/2017 Roof Lights The roof lights come packed in with your accessories and need to be inserted on site. On top of the roof there are 24 nuts, which simply need tightening by hand. Once this is done, the lights simply push onto the fitting.
  • Page 58 insigniarange.com Last Modified: 27/01/2017 Roof cover After installing the LED light fixtures place the roof cover over the led cables as shown in the diagram.
  • Page 59 insigniarange.com Last Modified: 27/01/2017 Safety precautions Never leave children unattended in the shower or bath. Never bath children (under 12) using whirlpool function if fitted. Regulate the temperature of water before showering Never allow children to use the steam function. This function is for ADULTS ONLY. Always be aware of the steam outlet pod position.
  • Page 60 insigniarange.com Last Modified: 27/01/2017 Silicone Seal (vertical joints) shown in red on the inside of the shower TESTING FOR WATER LEAKS LEAVE THE SHOWER 24 HOURS AFTER BUILD TO ALLOW SEALENT TO CURE AND ENSURE THE SHOWER IS AWAY FROM ITS FINAL POSITION TO ALLOW REAR VIEWING Ensure all connections are tight and sealed including the waste, body jets and steam outlet (model dependent) on your shower.
  • Page 61 Then simply go on your device and pair up with the shower which will be named as “INS”. please search for “Insignia Showers” on YouTube and find our “SUN While your Bluetooth device is connected, use the music function button to pause and resume your Control Panel”...
  • Page 62 insigniarange.com Last Modified: 27/01/2017 Control Panel Instructions Connecting to Bluetooth Step2 Step1 Then simply go on your device and To connect a device via pair up with the shower which should be shown as “INS”. Once this is Bluetooth, press the music complete you will hear a beep to function button twice (which signify you’re connected and ready to...
  • Page 63 Once your control panel has been switched off the 03 system will automatically start and you will see “03” on your control panel. To see our tutorial videos for operating this control panel’s features, please search for “Insignia Showers” on YouTube and find our “SUN Control Panel” Playlist, or you can click here...
  • Page 64 Last Modified: 27/01/2017 Need Help? If so then simply download Insignia’s free comprehensive help and troubleshooting brochure now! Simply visit: www.insigniarange.co.uk/help.aspx...
  • Page 65: Parts List

    Part Code Part Description SP037 Speaker cover Part Code Part Description SP027 Monsoon Shower head SP042 SUN Control panel INS8058L-4 Column (Blank) SP078 Ozone Module (for Steam SP227 Microphone style hand INS8058L-7 Top & Bottom Door Rail Showers) shower INS8058L-6...
  • Page 66 All images are subject to copyright. Images may not be used in any way shape or form with out written permission from Maclean International Ltd. Images are NOT permitted to be saved, printed or uploaded. Violation of copyright laws are punishable by law. Insignia™ is a registered trademark of Maclean International Ltd...

Table of Contents