Starting Production - Samsung SM421 Operation Handbook

Advanced flexible component placer
Table of Contents

Advertisement

PART III. Production
2. Starting production (Quantity designated production)
1. Set the production quantity
- Select the 'Start' submenu after setting the total number of PCBs to be
worked in the <Production plan> edit box
Set the total number of PCBs to be worked in the <Production
plan> edit box. If the value becomes 0, the production is stopped.
2. Press 'Start' button in the operation pannel.
- Starts production.
Check if there is a worker around the machine before starting
production.
Warning
SM421 Operation Handbook
30