Designair CHAND Installation And User Manual page 10

Table of Contents

Advertisement

Using template dimensions(fig2),
mark and drill 4 holes at the ceiling to
hang the Cooker hood (1). Insert the
wall plugs (6).
Disassemble the glass set from the
ceiling plate (fig. 3).
Fix the ceiling plate with the screw
(5) in the plugs (fig. 4).
Connect the Main supply to the
Terminal Block (fig. 5).
Assemble the glass set to the ceiling
plate (fig. 6)
Measure the steel cables length
keeping them tight and fix the holding
brackets at the correct height (fig.7).
Use the packaging box to situate
the Cooker Hood (1) on the top of the
cooking surface (fig 8-9).
Fix the holding brackets to the hood
and take out the packaging box (fig. 10-
11).
Check the hood levelling (fig. 12).
Disassemble the glass set from the
ceiling plate, to level the hood using the
mechanism (fig. 13-14).
Disassemble the wiring protection
from the glass set. Pass the hood supply
cord through the hole, and connect to
the Terminal Block in the ceiling plate
(fig.15-16).
Assemble the glass set to the ceiling
plate, and assemble the wiring
protection (fig. 17).
Remove the protective film (fig. 18)

Advertisement

Table of Contents
loading

Table of Contents