VTech Toot-Toot Drivers Construction Site User Manual page 11

Hide thumbs Also See for Toot-Toot Drivers Construction Site:
Table of Contents

Advertisement

3. Insert the SmartPoint
the crane as shown below. You will hear a click sound to indicate
the SmartPoint
control platform is connected to the crane, it cannot be detached.
4. Connect the crane to the circular opening on top of the shape sorter
tower as shown below. You will hear a click sound to indicate the
crane is secure. Once the crane is connected to the shape sorter
tower, it cannot be detached.
5. Insert the SmartPoint
supports as shown below. You will hear a click sound to indicate
the SmartPoint
basket lift base is connected, it cannot be detached.
control platform to the four open slots on
®
control platform is secure. Once the SmartPoint
®
basket lift base into the four basket lift
®
basket lift base is secure. Once SmartPoint
®
®
®
10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents