ECOVENT USA EV-SHT Installation Instructions Manual page 14

Table of Contents

Advertisement

chimney pipe.
2. Bolt on the Roof Support Brackets to the Roof Support Band using the
supplied hardware. Attach the Roof Support Brackets to roof using (4) 8 penny
nails or (4) #8, 1-1/2" screws per side (Fig 18).
3. Determine how much EV-HST chimney will be extending into the room
(minimum of 3" below the ceiling). Be sure to maintain the proper clearance to
combustibles (walls and ceilings) for the connector pipe. Once you have
identified the proper height for your installation, attach the Roof Support Band
to the Chimney Section by tightening the Bolt, and secure it with supplied
hardware.
4. Attach desired length of Chimney Sections above and below the roof level
(max. of 45' total, 20' below the support) (Fig 18).
5. Refer to Steps 10 & 11 in the Ceiling Supported Installation section (page 8,
9) to complete the Roof Supported installation.
Alternative Installation Location for Roof Support: The Roof Support may be
used at the bottom of a Chimney installation (Fig 19). This may be useful for
some basement installations. Maintain a minimum of 2" clearance to
combustibles at all times. The EV-HST chimney needs to extend a minimum of
3" below the finished ceiling or exposed framing members. Please note that
you cannot extend the chimney all the way to the appliance – you must have
some connector pipe.
Fig 16
12

Advertisement

Table of Contents
loading

Table of Contents