Sharp SM-SX100 Service Manual page 23

Digital
Table of Contents

Advertisement

As shown, bundle A after passing the doubly stacked upper core through
the hole on the side of the bottom shield of 1-bit amplifier.
A
Bundling on the hole on
the
marked side.
Core mounting and line process illustration
Bundle CNP102 (3P) on the core process
hardware with nylon band.
Process the lead line on the chassis side.
Don't direct the head of the nylon band upward.
CNP102
Nylon
Band
A
Figure 23-1
Before installing the core process hardware, attach the
core to the lead line from the front panel.
Pass the nylon band through the hole of the core process
hardware, and fasten the core.
(The head of the nylon bond must not be positioned on
the upper side.)
(Take care for the front and rear sides of the core process
hardware.)
After the process, install the core process hardware.
Core Process
Bracket
B
Figure 23-2
– 23 –
After the line is processed, the connectors CNWAM1B, CNWAM28,
CNWAM1C and CNWAM2C must not be retained with the core or lead line.
Using the nylon band, scoop up all lead lines
processed with the core and bundle them.
A
Pull up CNS902 which is passed
under, and insert it into CMP807.
(CNP803)
(CNP807)
B
A
B
Since CNS902 is thick, don't process it with the clamper
of Area B, and bundle it on CNS906 and CNS905 with
nylon band (X2). Don't direct the head of the nylon band
upward.
Process CNS906 and CNS905 on the clamper of Area B.
SM-SX100
Insert CNS803 to CNP803.
Only CNS902 inserted to CNP697
is processed with the edge saddle
and clamper.
Process CNS906 from the front panel
with the edge saddle of Area A, and
insert it into CNP804.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents