Ruijie Networks RG-WALL1600-S3600 Hardware Installation And Reference Manual

Next-generation firewall

Advertisement

Quick Links

RG-WALL1600-S3600 Next-Generation Firewall
Hardware Installation and Reference Guide V1.3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RG-WALL1600-S3600 and is the answer not in the manual?

Questions and answers

Summary of Contents for Ruijie Networks RG-WALL1600-S3600

  • Page 1 RG-WALL1600-S3600 Next-Generation Firewall Hardware Installation and Reference Guide V1.3...
  • Page 2: Copyright Statement

    This document is provided “as is”. The contents of this document are subject to change without any notice. Please obtain the latest information through the Ruijie Networks website. Ruijie Networks endeavors to ensure content accuracy and will not shoulder any responsibility for losses and damages caused due to content omissions, inaccuracies or errors.
  • Page 3: Obtaining Technical Assistance

    It is intended for the users who have some experience in installing and maintaining network hardware. At the same time, it is assumed that the users are already familiar with the related terms and concepts. Obtaining Technical Assistance  Ruijie Networks Website: http://www.ruijienetworks.com/  Service Email: service_rj@ruijienetworks.com ...
  • Page 4: Chapter 1 Product Introduction

    Figure 1-1 Appearance of the RG-WALL1600-S3600 Front and Back Panels The RG-WALL1600-S3600's front and back panels are shown in Figure 1-2. See the description for the detailed parts specified by the numbers in the figure.
  • Page 5 · Figure 1-2 Front Panel of the RG-WALL1600-S3600 Status/Port Type Description Console Console Console port Power Green Indicates that the device is on. Indicates that the device is off. STATUS Green Indicates that the device is operating properly. Blinking Indicates that the device is initiating.
  • Page 6: Chapter 2 Preparation Before Installation

    Chapter 2 Preparation Before Installation Safety Suggestions To avoid body injury and equipment damage, please carefully read the safety suggestions before you install RG-WALL1600-S3600. The following safety suggestions do not cover all possible dangers. Safety Precautions for Installing the System ...
  • Page 7: Installation Site Requirements

    Installation Site Requirements RG-WALL1600-S3600 must be used in the room. This series of products are desktop devices, so they can be placed in non-machine-room or mounted into a rack with the support of a tray. To ensure normal operation and a prolonged use life of the equipment, the installation site must meet the following requirements.
  • Page 8: Temperature And Humidity Requirements

    · Figure 2-1 shows the ventilation requirements of the RG-WALL1600-S3600. Keep the device Allow at least 3.8 cm of clearance around the ventilation openings. After connecting various cables, you should bundle the cables or place them in the cabling rack to avoid blocking air inlets.
  • Page 9: Installation Tool

    System Grounding Requirements A good grounding system is the basis for the stable and reliable operation of the RG-WALL1600-S3600. It is the key to prevent lightning stroke and resist interference. Please carefully check the grounding conditions on the installation site according to the grounding requirements, and perform grounding properly as needed.
  • Page 10 · Goods Checklist USB cables, Ethernet cables, power cables, screws, power adapters and optical disk containing Installation Kit tools and documents. A normal delivery should contain the above mentioned items, which may differ from the actual delivery, depending on purchase contracts. Please check your goods carefully against the packing list or purchase contract.
  • Page 11: Chapter 3 Product Installation

    Bind cables or fibers Verification Installation Verification The RG-WALL1600-S3600 is complicated equipment, so you must carefully plan and arrange the installation location, networking mode, power supply, and wiring before installation. Verify the following before installation:  The installation location is of a good air flow.
  • Page 12: Cabinet Installation (Optional)

    Note that the space between neighboring standard installation holes is a little smaller than that between an auxiliary installation hole and its neighboring standard installation hole. When installing a guide rail for the RG-WALL1600-S3600 series, ensure that the plane to carry the chassis should be installed on the plane of delimiters (entire-U delimiter) of the two neighboring RUs, as shown in Figure 3-1.
  • Page 13: Mounting Into The Cabinet (Optional)

    Levelly lift the RG-WALL1600-S3600 by two people on both sides, and slowly move it to the front of the cabinet. Levelly lift the RG-WALL1600-S3600 to a position slightly higher than the tray or the slide rail of the cabinet, put the equipment onto the tray or the slide rail, and push it into the cabinet.
  • Page 14: Connecting The External Port Cables

    · Precautions  Before connecting the power supply, you must verify that the external power supply matches the power module installed with this equipment.  Before connecting the power cable, be sure that the switch of the power module is at the OFF position. ...
  • Page 15: Verifying The Power Supply

    · Verifying the Cables  Verify that the twisted pairs match the ports.  Verify that the cables have been bound properly. Verifying the Power Supply  Verify that the power cables are in good contact and comply with the safety requirements. ...
  • Page 16: Chapter 4 System Debugging

    · Chapter 4 System Debugging Establishing the Configuration Environment Because this series of products are desktop devices, easy configuration is provided without application of console cables. The user name and password are admin and firewall respectively. Initial Connection Connect one end of a power cable to the power port on the device, and then connect the other end of the cable to a power outlet.
  • Page 17 · Choose Start > Programs > Accessories > Communications > Hyperterminal. The hyperterminal window appears. Click Cancel. A window appears as shown in Figure 4-1. Figure 4-1 In the Connectivity Note window, type the name of the new connection and click OK. A window appears as shown in Figure 4-2.
  • Page 18: Parameter Settings

    · After setting the serial port parameters, click OK. Now many PCs do not have Console ports and systems do not support hyperterminals. Therefore, Console-to-USB cables and terminal emulators (e.g., SecureCRT) are needed. Parameter Settings Step 1. Connect both ends of the Console-to-USB cable to the Console port of the device and the USB port of the PC properly.
  • Page 19 · Click Next, and the following interface will be displayed. Figure 4-6 After configuring the parameters, click Next, and you can configure the session name. Click OK, and the following interface will be displayed. Figure 4-7...
  • Page 20: Power-On Startup

    · Click Finish, and the following interface will be displayed. Figure 4-8 Power-on Startup Checking Before Power-on  The device is properly grounded.  The power cable is correctly connected.  The power supply voltage complies with the requirement of the device. ...
  • Page 21 · After power-on, you are recommended to perform the following checks to ensure the normal operation of follow-up configurations.  Check that information appears on the terminal.  Check that the device indicator is normal.
  • Page 22: Chapter 5 Monitoring And Maintenance

    · Chapter 5 Monitoring and Maintenance RG-WALL1600-S3600 Monitoring Indicators When the RG-WALL1600-S3600 is running, you can monitor the status of each single-board by inspecting the status LED of the appropriate single-board. Figure 5-1 LED Description Status/Port Type Description Console Console...
  • Page 23: General Installation Troubleshooting Flow

    · Chapter 6 Troubleshooting General Installation Troubleshooting Flow Abnormal working Check the cabinet installation (if the device is mounted into a cabinet) Check the mounting of (if the device is RG-WALL1600-S3100 mounted into a cabinet) Check the power connection Check the installation of the power module Check the line cards and other plug-in units on the backplane...
  • Page 24 · [Troubleshooting] Please contact Ruijie technical support. Fault 2 The AC power module does not work. [Fault Description] The Status LED of each line card is OFF, the Power LED is OFF, and the fan does not work. The LED on the panel of the power module is OFF. The fan does not work. [Troubleshooting] Check if the cables of the cabinet have been correctly connected.
  • Page 25: Appendix A Connectors And Connection Media

    · Appendix A Connectors and Connection Media 1.1000BASE-T/100BASE-TX/10BASE-T Port 1000BASE-T/100BASE-TX/10BASE-T is a port that supports adaptation of three rates, and automatic MDI/MDIX Crossover at these three rates. The 1000BASE-T complies with IEEE 802.3ab, and uses up to 100m of 100-ohm Category-5 or Supper Category-5 UTP or STP cable.
  • Page 26: Appendix B Cabling Recommendations In Installation

    Appendix B Cabling Recommendations in Installation When RG-WALL1600-S3600 is installed in standard 19-inch cabinets, the cables are tied in the binding rack on the cabinet by the cabling rack, and top cabling or bottom cabling is adopted according to the actual situation in the equipment room.
  • Page 27 ·  After bundling up cables with buckles, you should cut off the remaining part. The cut should be smooth and trim, without sharp corners, as shown in Figure B-2. Figure B-2 Bundling up cables (2)  When cables need to bend, you should first bundle them up. However, the buckle cannot be bundled within the bend area.
  • Page 28 ·  The hard power cable should be fastened by the terminal connection area to prevent stress.  Do not use self-tapping screws to fasten terminals.  Power cables of the same type and in the same cabling direction should be bundled up into cable bunches, with cables in cable bunches clean and straight.

Table of Contents