Test operation

Mode
Room
Total
16
E-
1
Check if the LCD display turns on after powering on the
power distribution unit.
KWH
KWH
2
Set the communication protocol between the digital electric
meter and the power distribution unit.
3
Check the communication status by pressing the
or
the communication protocol.
4
Check if the total value displayed on the power distribution
unit is the same as the digital electric meter's.
button after completing all the settings for