Midea MEHSU-09CHD2 Service Manual page 63

Indoor/outdoor units
Table of Contents

Advertisement

Hang the air-in grill to the panel, then connect
the lead terminator of the swing motor and that
of
the
control
box
terminators on the body respectively.
Note: The panel shall be installed after the
wiring connected.
12.2.3 Console indoor unit installation
12.2.3.1 Service space for indoor unit
12.2.3.2 Install the main body
Fix the hook with tapping screw onto the
wall
Hang the indoor unit on the hook.
with
corresponding
(The bottom of body can touch with floor or
suspended, but the body must install vertically.)
14.2.4 Ceiling-floor unit installation
12.2.4.1 Service space for indoor unit
1.38in
12.2.4.2 Bolt pitch
① Ceiling installation
Capacity (Btu/h)
18K / 24K
36K
48K
61
39.37in
D
E
mm
983
220
inch
38.70
8.66
mm
1200
220
inch
47.24
8.66
mm
1565
220
inch
61.61
8.66

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents