Download Print this page

Gemtek Systems WLTMS-110_384041 Quick Installation Manual page 6

Lte cpe

Advertisement

Installing LTE outdoor CPE
Selecting a Location: LTE Outdoor CPE should be pole-mounted
outdoors and aligned so its antenna faces the nearest LTE eNB.
When selecting a suitable location for the unit, consider these
guidelines:
Place LTE Outdoor CPE as high as possible to achieve the best
possible link quality.
Place the LTE Outdoor CPE away from power and telephone
lines.
Avoid placing LTE Outdoor CPE too close to any metallic
reflective surfaces.
Be sure to ground LTE Outdoor CPE with an appropriate
grounding wire (not included) by attaching it to the grounding
screw on the unit and to a good ground connection.
Mounting the ODU: Mount LTE Outdoor CPE on a 1"-4" pole
using the supplied kit, or the optional tilt accessory.
Using the clamp
1. Thread the M10*100mm bolt through a spring washer, flat
washer and the bracket holes.
2. With the connector facing downward, attaché LTE Outdoor
CPE to a 1"-4" pole.
3. Attach the bracket to the other side of the pole.
4. Thread the M10*100mm bolts through both holes on either
side, and tighten the nuts.

Advertisement

loading