The Power Area

The Power Area has two switches that control power to the board and the
type of operation (Figure 7). The Master Power switch supplies power from
the 9V battery or the power jack to the board. The power jack accepts a
2.5mm plug with the tip ground and the shell 7 to 12VDC.
The Mode Select switch configures the board for either Prototype operation
(left position) or Evaluation operation (right position). In Prototype operation,
the module's signal lines are routed to the header next to the Prototype
Area. This allows custom circuits to easily interface with the module.
In Evaluation operation, the module's signal lines are routed to the
Evaluation Area. The controls in this area allow the module to be operated
without any other circuits, microcontrollers or a PC.
Three LEDs show the state of the module. Active shows the module is
on and ready for operation. Standby and Power Down indicate that the
low power modes have been entered and the module is not ready for
operation.
Figure 7: The Development Board Power Area

The Evaluation Area

The Evaluation Area is activated by setting the Mode Select switch to the
right position. Figure 8 shows the Evaluation Area.
The Evaluation Select switch configures the area for different types of
evaluation. The left position puts the module into transmit mode.
The orange TX LED lights up and any data present on the blue DATA_IN
test point is transmitted by the module.