1-2-7 Motor Loading Ass'y Removal
1) Remove the screw Œ.
2) Remove the Motor Loading Ass'y ´.
Fig. 1-11 Motor Loading Ass'y Removal
Samsung Electronics
´ MOTOR LOADING ASS`Y
Œ SCREW
1-2-8 Bracket Gear, Gear Joint 2, 1 Removal
1) Remove the SCREW Œ.
2) Remove the Bracket Gear ´.
3) Remove the Gear Joint 2 ˇ.
4) Remove the Gear Joint 1 ¨.
Assembly :
1) Be sure to align dot mark of Gear Joint 1 Œ with
dot mark of Gear Joint 2 ´ as shown Fig 1-13.
(Refer to Timing point1)
2) Confirm the Timing Point 2 of the Gear Joint 2 ´
and Slider Cam ˇ.
¨ GEAR JOINT 1
ˇ GEAR JOINT 2
Fig. 1-12 Bracket Gear, Gear Joint 1,2 Removal
Œ GEAR JOINT1
´ GEAR JOINT2
TIMING POINT 2
TIMING POINT 1
Fig. 1-13 Gear Joint 1,2 Assembly
Disassembly and Reassembly
Œ SCREW
´ BRAKET GEAR
ˇ SLIDER CAM
1-7