The control module performs the following basic functions:
1.
Opens and closes the first (pilot) operator of the gas
valve.
2.
Provides a spark for igniting pilot burner.
3.
Senses the pilot burner flame.
4.
Shuts off the spark after pilot flame is lit.
5.
Opens and closes the second (main) operator.
These functions occur in two stages - trial for pilot ignition
and main burner operation as described below.
Trial For Pilot Ignition
On every call for heat (system start), control performs
internal safe-start check. If flame simulating condition is
present, system will not start.
During normal start, control opens first (pilot) valve
operator of gas control, which allows gas to flow to pilot
burner. At same time, electronic spark generator in control
produces 15,000 Volt spark pulse output (open circuit).
This voltage produces spark at igniter sensor rod which
ignites pilot burner. If pilot flame does not light or presence
of pilot flame is not detected back through flame=rod,
control will not open second (Main) valve operator of gas
control. Control will continue to try to ignite pilot burner
until either flame is detected or thermostat
(controller)
is
set down below call for heat.
Main Burner Operation
When pilot flame is established, flame rectification
circuit is
completed to burner ground. Control flame sensing circuit
detects flame current,
shuts off spark generator and opens
second (Main) valve operator to allow gas to flow to main
burners. Pilot flame ignites main burner conventionally.
IMPORTANT:
Electronic control module cannot be repaired.
If troubleshooting procedure indicates malfunction in control,
control must be replaced. Intermittent
Pilot systems should be
serviced only by trained, experienced service technicians.
Preliminary
Check
Following visual checks should be made before
troubleshooting
and after maintenance.
1.
Check power switch.
2.
Manual shutoff valves in gas line to boiler must
be
open.
:3. Make sure all wiring connections are clean and tight.
4.
Review control's normal sequence of operation.
System Troubleshooting
Start system by setting thermostat or controller above room
temperature and observe system response.
Establish type of system malfunction
or deviation from
normal operation by using Pilot System Troubleshooting
Table, in following section.
Use table by following questions in boxes. If condition is
true (answer is yes), go down to next box. If condition is
not true (answer is no), go to box alongside.
Continue checking and answering conditions in each box
until problem and/or repair is explained. Use Component
Checks section, see below, as necessary, to perform system
checks.
After any maintenance
or repair, troubleshooting
sequence
should be repeated until procedure ends with normal
system operation.
Check Spark Ignition
Circuit
Electronic module and step-up transformer in control provides
spark ignition at 15,000 V (open circuit). Check circuit at
control module as follows:
1.
Turn off manual gas valve to prevent flow of gas.
Electrical
shock
hazard.
Do not touch
either
end
of jumper
or stud terminal,
high voltage
circuit.
Failure to follow
these instructions
could
result
in
death
or serious
injury.
o
o
o
Disconnect ignition cable at control stud terminal to
isolate circuit from pilot burner/igniter-sensor,
and
prepare short jumper lead using heavily insulated wire,
such as ignition
wire.
Energize control and touch one end of jumper firmly to
control ground terminal (GND). (Do not disconnect
existing
ground lead.)
Move free end slowly toward
stud terminal to establish spark. Pull lead wire slowly
away from stud. Note length of gap at which arcing
discontinues.
Arc length of 1/8 inch (3.2 mm) or more indicates
satisfactory voltage output. If no arc can be established
or maximum gap is less than 1/8 inch (3.2 mm), replace
control.